Similar Projects
Canyon Wren Townhomes - General Contractor Bids Needed
New Construction, Infrastructure - 30,000 SF
Design
$7,000,000 CJ est. value
Moab, UT 84532

Pavement Preservation Southern Utah & Pavement Preservation Great Basin
Infrastructure
Design
$10,000,000 CJ est. value
Moab, UT 84532

Wilson Arch Special Service District Water Improvements 2023
Infrastructure
Bidding
$590,000 CJ est. value
Moab, UT 84532

Wilson Arch Special Service District Water Improvements 2023
Infrastructure
Bidding
$590,000 CJ est. value
Moab, UT 84532

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

US-191; Passing Lane, MP 153.0 to MP 157.0
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
UT

Canyon Rims Road
Infrastructure
Results
$7,710,828 CJ est. value
Moab, UT 84532

The Atlas Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Moab, UT 84532

The Atlas Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Moab, UT 84532

Asphalt Paving - Arches National Park
Infrastructure
Post-Bid
$250,000 CJ est. value
Moab, UT 84532

Pack Creek Bridge Widening
Infrastructure
Results
$1,097,800 CJ est. value
Moab, UT 84532

HooDoo Hotel Phase II
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Moab, UT 84532

The Lost Springs Apartments
New Construction, Infrastructure - 72,824 SF
Post-Bid
$30,000,000 CJ est. value
Moab, UT 84532

Moab Dispersed Parking Project - Downtown
Infrastructure
Results
$7,471,464 CJ est. value
Moab, UT 84532

Last Updated 12/20/2023 11:07 AM
Project Title

La Sal Mountain Loop Road

Physical Address View project details and contacts
City, State (County) Moab, UT 84532   (Grand County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $21,995,114 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT NUMBER: UT FLAP 73(2) PROJECT NAME: La Sal Mountain Loop Road PROJECT DESCRIPTION: The UT FLAP 73(2), La Sal Mountain Loop Road Project is located approximately 8 miles southeast of Moab, UT in Eastern Utah. The project crosses through Utah State School and Institutional Trust Lands (SITLA), Bureau of Land Management (BLM), private, and United States Forest Service (USFS) lands, providing access to the Manti - La Sal National Forest and Bureau of Land Management lands. The route is categorized as a major rural collector in mountainous terrain and is maintained by San Juan County. This project rehabilitates and reconstructs the existing road with minor superelevation correction, profile adjustments, curve widening, ditch reconstruction, culvert replacements, asphalt surfacing, erosion control, signing, and pavement markings. The existing pavement is in poor condition with significant rutting, cracking, and potholing apparent along the route. To complete the proposed widening and realignment, rock and soil cuts and fills are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered. The project consists of two segments, broken into Schedule A and Option X. Segment 1 (Option X) - Segment 1 goes from the intersection of Old Airport Road 11+62 to 147+00 at the intersection of Pack Creek Cutoff. Rehabilitation and widening consists of pulverizing the existing pavement, widening the road to 30 feet from the beginning to 45+00 and 26 feet for the remainder of the road, placing aggregate base and asphalt concrete pavement, and drainage improvements. Segment 2 (Schedule A) - Segment 2 goes from 147+00 at the intersection of Pack Creek Cutoff, and goes to 650+91, the boundary with the previous project UT PFH 46-1(2) and UT FLAP 73(1). Rehabilitation consists of pulverizing the existing pavement, placing new aggregate base leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet. Five locations will be reconstructed requiring raising or lowering profile, placing aggregate base, asphalt concrete pavement, and drainage improvements to widen the roadway width to 26 feet. PRINCIPAL WORK ITEMS (Schedule A): 20401-0000 Roadway Excavation: 75,000 CUYD 30101-0000 Aggregate Base: 55,000 TON 30401-5500 Full Depth Reclamation: 9.45 Miles 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 31,000 TON 60201-1000 Culverts: 4000 LNFT 63501-1000 Temporary Traffic Control: LPSM PRINCIPAL WORK ITEMS (Option X): 20401-0000 Roadway Excavation: 16,000 CUYD 30101-0000 Aggregate Base: 25,000 TON 30401-5500 Full Depth Reclamation: 2.56 Miles 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 9,600 TON 63501-1000 Temporary Traffic Control: LPSM ESTIMATED COST RANGE: Total estimated cost between $20,000,000 and $30,000,000 This is a full and open competition. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON NOVEMBER 29, 2023 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents