Similar Projects
Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

207 Calhoun Street
Addition, Renovation, Infrastructure
Bidding
$1,400,000 CJ est. value
Charleston, SC 29424

207 Calhoun Street
Addition, Renovation, Infrastructure
Bidding
$1,400,000 CJ est. value
Charleston, SC 29424

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

CARTA Parking Lot Expansion
Infrastructure
Post-Bid
North Charleston, SC 29405

Construction of Azalea Fuel Facility
New Construction, Infrastructure
Results
$13,906,000 CJ est. value
North Charleston, SC 29405

Community Center Parking Area Replacement
Infrastructure
Results
Folly Beach, SC 29439

540 King Street
New Construction - 7,800 SF
Construction
$1,500,000 est. value
Charleston, SC

Society at Laurens
New Construction
Construction
$35,420,000 est. value
Charleston, SC

Christian Brothers - Charleston
New Construction, Infrastructure - 5,500 SF
Pending Verification
$1,250,000 CJ est. value
Charleston, SC 29412

Christian Brothers - Charleston
New Construction, Infrastructure - 5,500 SF
Pending Verification
$1,250,000 CJ est. value
Charleston, SC 29412

Huger Street Hotel
New Construction, Infrastructure
Design
$37,000,000 CJ est. value
Charleston, SC 29403

Bainbridge Avenue Water Main Replacement Project
Infrastructure
Post-Bid
Charleston, SC 29407

2020 Line Stop Project on Meeting Street Road
Infrastructure
Results
North Charleston, SC 29405

Last Updated 11/14/2022 02:02 PM
Project Title

Wentworth Street Development

Physical Address View project details and contacts
City, State (County) Charleston, SC 29401   (Charleston County)
Category(s) Heavy and Highway, Residential, Sewer and Water
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the redevelopment of existing structure, one new structure, parking and utilities. As of August 4, 2022, this project is in planning and is pending approval from the Charleston Technical Review Committee. Information regarding the architect and general contractor has not been determined. Although a firm timeline for construction has not been determined, construction is not expected to begin before summer 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents