Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Gisler Avenue Landscape Improvements - City of Costa Mesa
Infrastructure, Alteration
Conception
$350,000 est. value
Costa Mesa, CA 92626

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Primary Sedimentation Basins No. 6-31 Reliability Improvements at Plant No. 1
Renovation
Post-Bid
$7,900,000 est. value
CA

Thickening and Dewatering Building Pipe Support Improvements at Plant No 1
Renovation
Post-Bid
$1,000,000 est. value
Fountain Valley, CA

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

First Street Slope Stabilization Project (Rebid2)
Infrastructure
Results
$4,482,892 CJ est. value
Santa Ana, CA 92701

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

New 7-Eleven Store and Fuel / Orange
Demolition, New Construction, Infrastructure - 4,319 SF
Construction
$1,100,000 CJ est. value
Orange, CA 92868

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Fire Station No. 4 Replacement - City of Laguna Beach
Demolition, New Construction, Infrastructure - 9,975 SF
Pending Verification
$6,100,000 CJ est. value
Laguna Beach, CA 92651

Adams Avenue Bicycle Facility - Fairview Road to Harbor Boulevard - City of Costa Mesa
Infrastructure
Conception
$1,500,000 est. value
Costa Mesa, CA 92627

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 CJ est. value
Orange, CA 92869

Trickling Filter Sludge and Scum Pumps Replacement at Plant No. 1
Renovation
Post-Bid
$1,729,000 est. value
CA

Last Updated 03/21/2023 07:07 PM
Project Title

Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1 - Orange County Sanitation District

Physical Address View project details and contacts
City, State (County) Fountain Valley, CA 92708   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected January 2027 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Per the owner, as of March 21, 2023, an award has been made for this solicitation. The owner states that construction is anticipated to begin in January 2027. Closed solicitation has been included below for reference. ……………….. This project will replace Primary Clarifiers 3, 4, and 5 (circular) at Plant 1, which are nearing the end of their useful life. The successful Consultant will be responsible for performing engineering services including design and construction support services. Type of Award Lump Sum Bid Bond Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% The method of contractor selection has not been determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents