Similar Projects
Last Updated | 08/15/2022 02:12 PM |
Project Title | CEPP New Water Seepage Barrier |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33132 (Miami-Dade County) |
Category(s) | Heavy and Highway, Sewer and Water, Single Trades |
Sub-Category(s) | Masonry, Site Development, Storm/Sewers |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $42,258,301 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of furnishing all materials, labor, tools, and equipment required for the construction of approximately 4.9 miles of new curtain wall (vertical subsurface barrier) along the L-357W Levee. The overall project consists of the design of a seepage barrier along the Levee 31N (L-31N) in Miami-Dade County. The project intendsto controlseepage from Everglades National Park and provide the appropriate amount of groundwater flow to minimize potential impacts to the West Well Field and Biscayne Bay. To meet these needs, a levee curtain wall (vertical subsurface barrier) has been proposed along L-31N in Miami-Dade County to reduce seepage flow from ENP. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |