Similar Projects
White Mountain Apache Tribe Water Settlement - U0164 - City Of Avondale
Alteration
Conception
$2,800,000 est. value
Whiteriver, AZ 85941

Construct Runway 2/20 (60' x 4,712') - City of Show Low
Infrastructure
Conception
$5,000,000 CJ est. value
Show Low, AZ 85901

Jr's Shop Addition
Addition, Demolition, Renovation, Infrastructure - 1,400 SF
Design
$280,000 CJ est. value
Joseph City, AZ 86032

Pre-Settling Pond Upgrades for the White Mountain Apache Tribe
Infrastructure
Design
$275,150 CJ est. value
Whiteriver, AZ 85941

RFQ Contractor - Hopi Health Care Center Quarters Construction
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
First Mesa, AZ 86042

RFQ Contractor - Hopi Health Care Center Quarters Construction
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
First Mesa, AZ 86042

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

System Enhancement (Safety Improvements)
Infrastructure
Results

Pavement Preservation
Infrastructure
Results
$7,128,000 est. value
AZ

Family Dollar #24436 / Holbrook
New Construction, Infrastructure - 10,547 SF
Construction
$199,999 CJ est. value
Holbrook, AZ 86025

Hashknife Solar Energy Center
Infrastructure
Pending Verification
$100,000,000 CJ est. value
Holbrook, AZ 86025

Frontier Park Playgound and Splash Pad - City of Show Low
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Show Low, AZ 85901

Construct Two Large Helicopter Parking Pads - City of Show Low
Infrastructure
Conception
$600,000 CJ est. value
Show Low, AZ 85901

2023 City of Show Low Slurry Seal Project
Infrastructure
Bidding
$268,000 CJ est. value
Show Low, AZ 85901

Last Updated 04/06/2023 05:05 PM
Project Title

Kayenta Township - Industrial Park Infrastructure

Physical Address View project details and contacts
City, State (County) Kayenta, AZ 86033   (Navajo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The Kayenta Industrial Park construction will include the construction of 3,300' of paved roadway including associated drainage features and a large detention pond. Utility construction will consist of the installation of 9,300 linear ft of 3" force-main sewer, 4,300 linear feet of 8" gravity sewer, and installation of a sewer lift station. Construction will run for an anticipated 3 calendar months from April 15th to July 15th, 2023. Scope of project may be decreased depending on available funding and bids received. Bids will be received for a single contract. The Project is expected to be substantially completed by July 15, 2023, and completed by July 30, 2023. Question Deadline 03/31/2023 Est. Completion Date: July 30, 2023 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Submit to Katie Andrews at "katie.a@jonesanddemille.com ".

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents