Similar Projects
Vendor Lists
Alteration
Design
Newfield, ME

Snow Removal
Term Contract
Design
Bangor, ME 04401

2022 Grants for Stream Crossing Infrastructure Improvements
Term Contract
Sub-Bidding
Augusta, ME 04330

Electrical/Control Maintenance and Repair Services - Regions 1 and 2
Term Contract
Sub-Bidding
Augusta, ME 04330

ME-Rachel Carson NWR-Cleaning Contract
Term Contract
Post-Bid
Wells, ME 04090

Public Waterless Toilet - ADA Compliant
Alteration
Post-Bid
Kingfield, ME

Septic Tank / Vault Toilet Pumping and Disposal Services
Term Contract
Results
Campton, Gorham, NH 03581

Graffiti Removal Services
Alteration
Results
Portland, ME

Snow Plowing and Snow Removal at the Concourse Parking Lot
Term Contract
Design
Waterville, ME 04901

Snow Removal Bids
Term Contract
Sub-Bidding
Ellsworth, ME 04605

Snowplowing for Grey Stone Mobile Home Park Season 2021-2022
Term Contract
Post-Bid
Veazie, ME 04401

Snow Removal
Term Contract
Design
Calais, ME 04619

Rubbish Removal Services - Region 2 - Mid-Coast Area
Term Contract
Sub-Bidding
Augusta, ME 04330

Snow Removal 2021/2022
Term Contract
Post-Bid
Bangor, ME 04401

Snow Fighter Services/Statewide - Statewide - Regions 1-5
Term Contract
Sub-Bidding
Augusta, ME 04330

Last Updated 10/31/2022 08:36 AM
Project Title

RFP Engineering - Planning Partnership Initiative - Route 11 - Main Street - Downtown

Physical Address View project details and contacts
City, State (County) Pittsfield, ME 04967   (Somerset County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Pittsfield (the Town) along with the Maine Department of Transportation (MaineDOT), and Kennebec Valley Council of Governments (KVCOG) are undertaking a feasibility study to identify ways to improve safety, accessibility, and mobility on and adjacent to Main Street / Route 11 for all transportation users. While this study will evaluate safety improvements, no comprehensive traffic modeling or intersection alternative analysis is anticipated. Specifically, this study will: (1) Identify safety and mobility improvements for all existing and reasonably foreseeable future transportation system users on the transportation system within the study area; (2) Assess traffic calming along Main Street / Route 11; (3) Evaluate expanded pedestrian connectivity beyond the downtown to Maine Central Institute and business / services along Route 11 towards the hospital at Leighton Street and Town Line; (4) Identify bicycle and pedestrian deficiencies within the study area and recommend improvements; (5) Assess any needed utility and drainage improvements; and (6) Address the aesthetics and compliment the traditional historic look, feel and character of the village center of Pittsfield. This study will identify transportation improvements that reduce congestion, improve pedestrian and traffic safety, complement long-range land use planning goals, and align with economic goals for Pittsfield. This study will not only consider roadway safety and mobility issues, but also improvements to active transportation. Other important factors include in-fill development and potential future mixeduse land use programs with higher residential density in the downtown. It will also consider the alternatives that complement the look feel and character of the historic village of downtown Pittsfield and supporting accessibility for all modalities. The study area extends on Main Street / Route 11, starting at the junction of Route 11 and the Pittsfield Townline and extending over the rail line, terminating at the intersection of Route 11 and Stinson Street, and includes logical nexus within a 5 to 10-minute walking distance of the study area: Manson Park, Stein Park, and Hathorn Park. The method of contractor selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents