Similar Projects
Seal Coating of Library Parking Lot
Post-Bid
Woonsocket, RI 02895

Lowe's #2863 - Parking Lot Rehabilitation
Renovation
Post-Bid
North Providence, RI 02904

The Landing
Results
Central Falls, RI

Installation of Portland Cement Concrete Sidewalks
Term Contract
Results
Woonsocket, RI

Parcel 25 Temporary Parking Lot Restoration
Post-Bid
Providence, RI 02903

Granite Curbing
Results
Woonsocket, RI

Construction Services for City Wide 50/50 Sidewalk Program
Post-Bid
Pawtucket, RI

Sidewalk, Road and Drainage Construction
Term Contract
Results
Providence, RI

Blackstone River Bikeway
Post-Bid
Central Falls, RI 02863

Police Station Parking Lot Expansion
Results
East Providence, RI

RI College Parking Lot D Renovations
Post-Bid
Providence, RI 02908

Employee Parking Lot Expansion
Results
Central Falls, RI 02863

Integrally Colored and Stamepd Concrete Sidewalk/Steps/Patio
Post-Bid
Providence, RI

Disability Accessible Parking
Results
Central Falls, RI 02863

Quad to Horace Mann ADA Walkway - Rhode Island College
Results
Less than $57,610 est. value
North Providence, RI 02908

Last Updated 12/18/2019 10:54 AM
Project Title

Slater Mill Phase II - Project

Physical Address View project details and contacts
City, State (County) Pawtucket, RI 02860   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,017,357
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall consist of various site improvements to the following areas: Widening of the sidewalk and improvements along the easterly side of Roosevelt Avenue from Leather Avenue to just south of Wilkinson Mill, the south side of Leather Avenue from Roosevelt Avenue easterly to the Blackstone River, and the Slater Mill parking lot in its entirety as well as the area that was formerly Slater Avenue. The work on this project will include, but not be limited to the following improvements: site preparation, removing and disposing existing sidewalks, pavements, landscaping, walls, lighting, etc.., provide new concrete sidewalks, removing and resetting existing granite curb, new or reconstructed wheelchair-ramps (ADA compliant), new curbing, bituminous pavement parking lot, placing of loam borrow and seeding, landscaping, lighting and electrical, signage, maintenance of traffic control, construction of an environmental cap per RIDEM requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents