Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

DSTT State of Good Repair Curved NB1612 Rail Replacement
Infrastructure
Bidding
$2,313,000 CJ est. value
Seattle, WA 98164

Soundview Terrace, 26th & Lynn St. PG, Cal Anderson Play Areas
Infrastructure
Bidding
$294,442 CJ est. value
Seattle, WA 98119

Prosser Memorial Health Replacement Hospital Bid Package #12: General Works
Demolition, New Construction, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Prosser, WA 99350

Precast Concrete Products - Value Blanket
Alteration
Post-Bid
Spokane, WA

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Kelsey Creek Picnic Shelter Paving
Infrastructure
Results
$15,000 est. value
Bellevue, WA 98005

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Economy Parking Lot 1 Expansion
Infrastructure
Bidding
$3,500,000 CJ est. value
Spokane, WA 99224

Russell Creek Project
Alteration
Post-Bid
WA

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Last Updated 08/24/2022 08:04 AM
Project Title

l-5/Mellen Street Connector Stage 1

Physical Address View project details and contacts
City, State (County) Centralia, WA 98531   (Lewis County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope : I-5/Mellen Street Connector Stage 1 #HLP-CNWA(015) The work required for this project includes street relocation construction to include demolition of existing buildings and structures, abandonment of existing utilities, grind and overlay of existing street connections, street widening, new road construction, sanitary sewer, watermain, and storm drain piping construction, and associated improvements. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated costs range is $5,000,000 to $6,000,000. It is anticipated that this project will be funded in part by the State of Washington. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for bids. The Port of Centralia, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in considerations for an award.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents