Similar Projects
Bridgeland Central - Master Development
New Construction - 506,000 SF
Conception
Cypress, TX 77433

Bridgeland Central - Master Development
New Construction - 506,000 SF
Conception
Cypress, TX 77433

O'Reilly Auto Parts (H66)
New Construction - 6,800 SF
Design
$500,000 to $900,000 est. value
Houston, TX

AutoZone #3138
New Construction - 6,000 SF
Design
$500,000 to $1,000,000 est. value
Houston, TX 77072

Right Move Self Storage
New Construction - 76,674 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77025

Bath & Body Works #2564
Renovation - 4,400 SF
Post-Bid
$225,000 est. value
Webster, TX 77598

Open Space Improvements to Serve Silverchase Meadows Park
Infrastructure
Results
$317,563 CJ est. value
Houston, TX 77014

Wood Leaf Phase 1 Detention & Fill Plan
New Construction
Results
Tomball, TX 77375

Avalon Apartments
New Construction
Construction
$1,450,000 est. value
Spring, TX

Houston Cao Dai Temple
New Construction - 3,726 SF
Construction
$299,000 est. value
Houston, TX 77066

Eagle's Trace RB 3.2
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Houston, TX 77077

Eagle's Trace RB 3.2
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Houston, TX 77077

Bethune Empowerment Center
Renovation - 21,748 SF
Conception
$3,100,000 est. value
Houston, TX 77088

Family Dollar
New Construction - 11,332 SF
Design
$365,000 est. value
Houston, TX 77074

Rehabilitate the Interior and Exterior of Allen Parkway Villages and Historic Oaks of Allen Parkway Villages
Renovation
Post-Bid
Houston, TX 77019

Last Updated 11/11/2022 03:06 PM
Project Title

Construction of the Covenant House Texas Campus Real Property

Physical Address View project details and contacts
City, State (County) Houston, TX 77006   (Harris County)
Category(s) Commercial, Heavy and Highway, Religious/Funeral, Residential
Sub-Category(s) Apartments/Condominiums, Office, Religious Facility, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Questions and Answers period will end as of 12:00 p.m. on October 27, 2022. CERTIFIED CHECK or acceptable BID BOND of not less than five percent (5%) shall accompany each bid. Successful awardee will be required to submit acceptable Payment and Performance Bonds all three required - to be submitted to Covenant House Texas. The Owner reserves the right to reject any and all proposals, waive informalities in the Bids, accepting the Bid which best serves the interest of the Owner, subject to the bids meeting all HUD and Texas General Land Office (GLO) procurement requirements. The rational for Owner's selection is provided with the bid form. This project will be federally funded by the U.S. Housing and Urban Development (HUD) Department through the Texas General Land Office (GLO), and administered by the Harris County Community Services Department (HCCSD). Bidders shall comply with regulations governing the CDBG Disaster Recovery Program (Regulation 24 CFR 570). Applicable requirements include, but are not limited to compliance with the Da- vis-Bacon and Related Acts, Fair Labor Standards, Equal Opportunity, Affirmative Action, Section 3 of the HUD Act of 1968, and contracting with small, minority, and disadvantaged firms, as detailed in the project manual. General Contractor Bid Specifications for Community Development Block Grant Supplemental Disaster Recovery (CDBG-DR), CDBG-D Program Project shall apply.

Details

4 Stories Above Grade, 104,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances, Religious Equipment.
Division 12 - Furnishings, Religious Art, Window Treatments, Casework, Specialty Casework, Religious Casework, Rugs and Mats, Office Furniture, Fixed Audience Seating, Pews and Benches, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents