Similar Projects
Mccoy Road Facility Improvements Water Line and Sewer Line
Infrastructure
Bidding
Orlando, FL 32885

Conserv I 36 Reclaimed Water Main Extension
Infrastructure
Post-Bid
$1,196,000 est. value
Orlando, FL 32824

UCF Campus Infrastructure and Utility Production Facility - Industrial Mechanical and Wet-Utility Piping Work
Term Contract
Results
Orlando, FL 32826

Residential and Commercial Backflow Testing and Repairs
Term Contract
Results
Orlando, FL 32801

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

The Hammocks Reclaimed Water Retrofit
Results
Ocoee, FL 34761

Water Meter and Backflow Installation and Exchange Services
Results
Orlando, FL

West Ponkan Road Construction of a Potable/Drinking Water Main (Ponkan Pines Road - Golden Gem Road)
Results
Apopka, FL 32712

Meter Boxes
Term Contract
Results
Orlando, FL 32801

Infrastructure Locator Contractor
Term Contract
Results
Orlando, FL 32801

Master Agreement for Water Distribution Construction Services, Lake Nona Boulevard Water Main Extension, Water Main Extension Boggy Creek North Phase 2A, and Neighborhood R and R Program Project Waterfront Estates Subdivision
Results
Orlando, FL 32824

South Water Reclamation Facility Flow Meter Improvements
Results
Less than $2,186,000 est. value
Orlando, FL 32819

McCoy Road Facility Watermain Improvements Project
Results
Orlando, FL 32812

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Water Main Improvements on Military Trail, Central Boulevard, and at the Water Treatment Facility
Results
Lake Worth, Orlando, FL 33463

Last Updated 09/27/2021 07:54 AM
Project Title

Orange County Convention Center North/South Concourse Penthouse Chilled Water Shutoff Valves Replacement

Physical Address View project details and contacts
City, State (County) Orlando, FL 32819   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $925,375
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the addition of six (6) automated isolation butterfly valves and six (6) inline flow meters to be installed in the main chilled water lines as they enter and exit the three (3) mechanical penthouses. Valves and flow meters shall be integrated into the building automation system (BAS).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents