Similar Projects
Install Emergency Generator and Power Outlets Building J00576 and 09511
Term Contract
Bidding
WA

MHR Residential Electrical
Alteration
Post-Bid
Puyallup, WA

JH Performing Arts Center - Lighting and AV Upgrades
Alteration
Post-Bid
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

On Call Electrical Services for Traffic Control Systems
Alteration
Post-Bid
WA

Downtown Campus DAS for the County-City Building and Jails
Alteration
Results
$1,100,000 est. value
Tacoma, WA 98402

Medium Voltage Circuit Breakers
Infrastructure
Post-Bid
$225,000 est. value
Tacoma, WA

Pierce County Three Sisters Radio Site - Generator Relocation and Contaminated Soil Cleanup
Alteration
Results
$350,000 est. value
Carbonado, WA 98323

TWCF Replace Failing Emergency Generator Building J01422
Term Contract
Post-Bid
$100,000 to $250,000 est. value
WA

On-Call Electrical Services
Term Contract
Results
WA

Generator Electrical and Seismic Improvements
Alteration
Post-Bid
Lakewood, WA 98499

Electrical Services for Facilities Management
Term Contract
Results
WA

Weatherization Residential Insulation 8550
Alteration
Post-Bid
Eatonville, WA

MHR Residential Electrical Repairs
Alteration
Results
WA

Reported 02/11/2022 12:00 AM
Project Title

USACE EC JBLM Replace Underrated Panels

Physical Address View project details and contacts
City, State (County) WA   (Pierce County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Seeded Task Order to Replace Underrated Panels Buildings 02272, 03168, 09630, 09993, and 11575 Joint Base Lewis McChord (JBLM): Contractor shall furnish all equipment, materials and labor in performing demolition and proper disposal of the electrical panels. The Contractor must provide repair of the interior walls after the demolition of electrical services, match existing building materials, seal all openings, and paint to match the existing wall paint. Interior sealants and paints must meet low emissions requirements.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 11 - Equipment.
Division 26 - Electrical, Operation and Maintenance of Electrical Systems, Medium-Voltage Switchgear, Medium-Voltage Circuit Breaker Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers, Electrical and Cathodic Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents