Similar Projects
Airfield Markings and Rubber Removal On-Call Contractor Services
Infrastructure
Bidding
Atlanta, GA

Middle Georgia Regional Airport Taxiway C Rehabilitation
Infrastructure
Bidding
$3,000,000 est. value
Macon, GA 31297

Runway 16-34 and Taxiway Improvements
Post-Bid
Tifton, GA 31793

Runway 17-35 Asphalt Mill, Replace, Re-marking, and Signage Corrections to Runway 18-36
Post-Bid
$345,000 est. value
Valdosta, GA 31601

Runway 11- 29 Seal Coat, Crack Seal, and Remarking Project
Results
$150,000 to $225,000 est. value
Wrens, GA 30818

Taxiway A Reconstruction and Realignment Project
Results
Athens, GA 30603

Airfield Shoulder Replacement
Infrastructure
Bidding
$300,000 est. value
Atlanta, GA

Runway 10-28 Crack Seal Rejuvenate Remark
Infrastructure
Post-Bid
GA

Compass Calibration Pad and Access Taxilane
Results
Less than $2,897,050 est. value
Brunswick, GA

Runway 2/20 Rehabilitation at Heart of Georgia Regional Airport
Infrastructure
Bidding
$200,000 est. value
Eastman, GA 31023

Apron Seal Coat
Infrastructure
Post-Bid
Toccoa, GA

Taxiway Object Free Area Improvements
Results
Clarkesville, GA 30523

Runway 10/28 Crack Seal and Re-Marking
Infrastructure
Post-Bid
Nashville, GA 31639

Aviation Apron Crack Seal, Rejuvenate and Remarking
Results
$144,095 est. value
Tifton, GA 31793

2021 for Obstruction Removal and Displaced Threshold
Infrastructure
Post-Bid
$150,000 est. value
Quitman, GA 31643

Last Updated 05/25/2022 03:21 AM
Project Title

Airport Runway 10-28 Rehabilitation

Physical Address View project details and contacts
City, State (County) GA   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as the rehabilitation of Runway 10-28 by means of pavement milling and asphalt overlay, generally 2-inches in depth. The runway is currently 5,509 feet in length and approximately 100 feet wide. The project will also involve relocation of the Runway-28 threshold by a distance of 85 feet. This relocation will also necessitate the relocation of the runway threshold lights, re-spacing of the runway edge lighting, and the Runway 28 PAPI system. The final element contained in this project is the replacement of approximately 180 linear feet of fencing on the east end of the airfield that was recently modified to comply with the height requirements in the Modification of Standards (MOS).

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents