Similar Projects
Highway 6 (Fairmeadows To Industrial Park Road) Water Main Replacement - W3320 - City Of Iowa City
Infrastructure
Conception
$540,000 est. value
Iowa City, IA 52240

Bradford Drive Water Main Replacement - W3300 - City of Iowa City
Infrastructure
Conception
$600,000 est. value
Iowa City, IA 52240

Steindler Orthopedic Clinic Ambulatory Surgery Center
New Construction, Infrastructure - 35,880 SF
Design
$19,200,000 CJ est. value
North Liberty, IA 52317

PCC Pavement - Grade and New
Infrastructure
Bidding
$30,000,000 CJ est. value
Coralville, IA 52241

RFP/Q Construction Manager at Risk - West Campus Parking Ramp - Construct Facility
New Construction, Infrastructure
Bidding
$39,000,000 CJ est. value
Iowa City, IA 52246

Costco Wholesale #1111 - Mezzanine Breakroom Addition / Coralville
Addition, Demolition, Infrastructure - 1,660 SF
Sub-Bidding
$450,000 CJ est. value
Coralville, IA 52241

PinSeekers Golf & Entertainment Facility / Tiffin
New Construction, Infrastructure - 49,022 SF
Sub-Bidding
$11,000,000 CJ est. value
Tiffin, IA 52340

Johnson County Historic Poor Farm Site Development
Infrastructure
Post-Bid
Iowa City, IA

Glendale Park Improvements
New Construction, Infrastructure
Results
$275,000 est. value
Iowa City, IA

Water Purification Maintenance
Term Contract
Results
Iowa City, IA 52246

North Ridge Parts 2 & 3
New Construction, Infrastructure
Pending Verification
$14,500,000 CJ est. value
North Liberty, IA 52317

Recreation Center ADA Improvements - R4351 - City of Iowa
Renovation, Infrastructure
Conception
$775,000 CJ est. value
Iowa City, IA 52240

2022 Traffic Calming Project
Infrastructure
Bidding
$65,000 CJ est. value
Iowa City, IA 52240

The Ventnor Mixed-Use Building - Bid Package #2
New Construction, Infrastructure - 141,557 SF
Sub-Bidding
$40,000,000 CJ est. value
Tiffin, IA 52340

Orchard Street Reconstruction
Infrastructure
Results
$1,220,000 est. value
Iowa City, IA

Last Updated 09/20/2022 09:01 PM
Project Title

2022 Sanitary Sewer Manhole and Pipe Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Iowa City, IA 52240   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will involve the following: Rehabilitation of existing sanitary sewers and manholes throughout the Iowa City, Iowa Area. Rehabilitation includes approximately 11,500 feet of 8 inch diameter CIPP lined sanitary sewers, reinstatement of approximately 198 laterals, and 46 sanitary manholes lined with centrifugally cast cementitious mortar liner with epoxy seal and other associated work. All work is to be done in strict compliance with the Project Manual prepared by Stanley Consultants, Inc, of Muscatine, Iowa, which has heretofore been approved by the City Council, and are on file for public examination in the Office of the City Clerk. Each proposal shall be completed on a form furnished by the City and must be submitted in a sealed envelope. In addition, a separate sealed envelope shall be submitted containing a completed Bidder Status Form and a bid security executed by a corporation authorized to contract as a surety in the State of Iowa, in the sum of 10% of the bid. The bid security shall be made payable to the TREASURER OF THE CITY OF IOWA CITY, IOWA, and shall be forfeited to the City of Iowa City in the event the successful bidder fails to enter into a contract within ten (10) calendar days of the City Council's award of the contract and post bond satisfactory to the City (in the form shown in Section 0510) ensuring the faithful performance of the contract and maintenance of said Project, if required, pursuant to the provisions of this notice and the other contract documents. The City shall retain the bid security furnished by the successful bidder until the approved contract has been executed, the required Performance, Payment, and Maintenance Bond (as shown in Section 0510) has been filed by the bidder guaranteeing the performance of the contract, and the contract and security have been approved by the City. The City shall promptly return the checks or bidder's bonds of unsuccessful bidders to the bidders as soon as the successful bidder is determined or within thirty days, whichever is sooner. The successful bidder will be required to furnish a Performance, Payment, and Maintenance Bond in an amount equal to one hundred percent (100%) of the contract price and in the form shown in Section 0510, said bond to be issued by a responsible surety approved by the City, and shall guarantee the prompt payment of all materials and labor, and also protect and save harmless the City from all claims and damages of any kind caused directly or indirectly by the operation of the contract, and shall also guarantee the maintenance of the improvement for a period of five (5) year(s) from and after its completion and formal acceptance by the City Council. Sewer Inspection Videos: Video files for the project locations can be provided, upon request of the bidder. Any data supplied on the videos are merely for the convenience of the prospective bidders, who are to rely upon their own explorations of latent or subsurface site conditions, before completing and filing their proposal. Prospective bidders are advised that the City of Iowa City desires to employ minority contractors and subcontractors on City projects. A listing of minority contractors can be obtained from the Iowa Department of Inspections and Appeals at (515) 281-5796 and the Iowa Department of Transportation Contracts Office at (515) 239-1422. Bidders shall list on the Proposal the names of persons, firms, companies or other parties with whom the bidder intends to subcontract. This list shall include the type of work and approximate subcontract amount(s). The Contractor awarded the contract shall list on the Contract its subcontractors, together with quantities, unit prices and extended dollar amounts. By virtue of statutory authority, preference must be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa Statutes. The Iowa reciprocal resident bidder preference law applies to this Project. The City reserves the right to reject any or all proposals, and also reserves the right to waive technicalities and irregularities Specified Start Date: October 17, 2022 Substantial Completion Date: May 31, 2023 Final Completion Date: June 30, 2023 Liquidated Damages: $500.00 per day

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents