Similar Projects
HUD - AC Replacement in LAN Room on 6th Floor
Post-Bid
Miami, FL 33131

Testing & Certifications of Fume Hoods
Post-Bid
Miami, FL 33125

Replacement of AHU-16
Results
Miami, FL 33136

Heat Pump AHU Replacement (SBE Set Aside)
Results
Miami, FL 33136

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

ACC-West Duct Heater Replacement (SBE Set Aside)
Results
$100,000 est. value
Miami, FL 33136

HVAC and Mechanical Products
Term Contract
Post-Bid

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

JL King Ductwork Cleaning Project
Post-Bid
Miami, FL 33132

J045--Services: CLC Re-Heat Replacement, Miami VA
Results
Miami, FL 33125

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Chiller Plant Services
Term Contract
Results
Miami, FL 33199

Homestead, ARB, FL HVAC IDIQ Sources Sought
Post-Bid
Homestead, FL

Reported 06/29/2021 12:00 AM
Project Title

LTCC AHU Replacement

Physical Address View project details and contacts
City, State (County) Miami, FL 33142   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of (2) chilled water air handling units (AHU) at the Jackson Health System satellite facility Long Term Care Center. The contractor to remove existing AHU and replace with new Trane “Performance Climate Changer (UCCA) Chilled Water Air Handling Units”, of like size, configuration and capacity. Included in the scope is installation of new shut-off valves, actuators, and pressure and temperature gauges. Replace chilled water piping and insulation, as required. Installation of single zone VAV chilled water controllers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents