Similar Projects
Reported | 06/29/2021 12:00 AM |
Project Title | LTCC AHU Replacement |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33142 (Miami-Dade County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of (2) chilled water air handling units (AHU) at the Jackson Health System satellite facility Long Term Care Center. The contractor to remove existing AHU and replace with new Trane “Performance Climate Changer (UCCA) Chilled Water Air Handling Units”, of like size, configuration and capacity. Included in the scope is installation of new shut-off valves, actuators, and pressure and temperature gauges. Replace chilled water piping and insulation, as required. Installation of single zone VAV chilled water controllers. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |