Similar Projects
Science Lab Renovations at Pequannock Township High School
Renovation
Post-Bid
$570,000 est. value
Pequannock Township, NJ 07444

District Wide Facilities ADA Improvements (Phase III)
Renovation
Post-Bid

Bathroom Renovations at Ridgedale Middle School
Renovation
Results
Florham Park, NJ 07932

New Mezzanine at Maintenance Building at Randolph High School
Results
Randolph, Troy Hills, NJ 07869

Wellness Center, Wood Shop, Media Center, & Steam Lab Renovation and Ceiling and Lighting Replacement (Original Building) at Ridgedale Middle School
Construction
Florham Park, NJ 07932

Auditorium Renovations at Ridgedale Middle School
Renovation
Construction
Florham Park, NJ 07932

Morris Knolls High School Secure Vestibule Project
Renovation
Post-Bid
Rockaway, NJ 07866

Bathroom Renovations at the West Morris Central High School
Renovation
Results
Chester, NJ 07930

Morris Hills and Morris Knolls High School Kitchen Renovation Project
Renovation
Post-Bid
$300,000 est. value
Rockaway, NJ 07866

New Vestibules at Frelinghuysen Middle School, Morristown High School, Alfred Vail Elementary School, Hillcrest Elementary School, Normandy Park Elementary School, and Woodland Elementary School
New Construction
Results
$142,000 to $320,000 est. value
Morris Plains, Morristown, NJ 07960

Life Skills Classroom Renovations
Renovation - 1,425 SF
Results
$175,000 est. value
Morristown, NJ 07960

Culinary Arts Lab Renovations at the West Morris Mendham High School
Renovation - 1,200 SF
Results
$300,000 est. value
Mendham, NJ 07945

Construction of a New Classroom Addition at Senior High School Campus - General Construction
New Construction
Results
Butler, NJ 07405

Science Classroom Renovations at Dover High School
Renovation
Results
Dover, NJ 07801

Synthetic Turf Field and Field Lighting at Mount Olive High School
Infrastructure
Results
$1,200,000 est. value
Mount Olive, NJ 07836

Last Updated 05/25/2022 11:33 PM
Project Title

Renovations to the Industrial Arts Room at the Mountain View Middle School

Physical Address View project details and contacts
City, State (County) Mendham, NJ 07945   (Morris County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $170,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work shall consist of preparation of the substrate, the furnishing and application of an epoxy based multi roller applied flooring system with flintshot or Q-Rok quartz aggregate and urethane topcoat. The system shall have the color and texture as specified by the Owner with a nominal thickness of 1/8 inch. It shall be applied to the prepared area(s) as defined in the plans strictly in accordance with the Manufacturer's recommendations. B. Cove base (if required) to be applied where noted on plans and per manufacturers standard details unless otherwise noted. The technical specification of equipment is as follows: 1. Ductwork Provide all labor, material, and ductwork to supply and install the following systems: Supply and Install complete dust collection system for Mendham Borough Mountainview Middle School. The contractor shall be responsible for supplying all necessary labor and material to provide a turnkey dust collection system for the school in accordance with NFPA 664, and any State and local codes. The system will be ducted to (13) wood working machines and (1) floor/table sweeps and (2) vacuum reels. The contractor will be responsible for supplying effective source capture hoods where needed. The equipment to be connected is as follows: (7) 2" drops see drawing for details (80cfm) (2) 3" drops see drawing for details (215 cfm) (4) 4" drops see drawing for details (400 cfm)

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents