Similar Projects
Tunnel Crossings of TXDOT Highways
Bidding
$15,800,000 est. value
Fort Worth, TX 76102

Victor Henderson Building Backup Water Line
Bidding
Fort Worth, TX 76102

Water Distribution, Wastewater Collection, and Storm Water Facilities to Serve Live Oak Phase 5
Post-Bid
TX

Morning-Star Development, Section 8, Phase 3
Post-Bid
Bedford, TX

Pressure Reducing Valve Improvements John McCain at Bandit Trail
Results
$189,050 est. value
TX

Westside V Part 2 Water Main
Results
Less than $3,600,000 est. value
Fort Worth, TX

NR Internal Pipeline Cleaning and CCTV Inspection FY20
Term Contract
Bidding
Dallas, Denton, TX

Construction of Morningstar Development, Section 8, Phase 4
Post-Bid
Bedford, TX

SH26 and Pleasant Run Road Water Lines
Results
$200,000 est. value
TX

Closed Pipe Transit Time Flow Control Meters
Bidding
Arlington, TX 76018

Morningstar Development, Section 5, Phase 5
Post-Bid
Bedford, TX 76021

Jenkin Heights Lift Station Abandonment
Results
$3,200,000 est. value
Fort Worth, TX

Craig Hanking 20-inch Water Main (for Future NY EST)
Bidding
$339,000 est. value
Arlington, TX

Mills Drive - Paving, Water and Storm Drain Improvements
Post-Bid
Euless, TX

Eagle Mountain Lake Drainage Basin
Results
Fort Worth, TX

Last Updated 01/07/2019 11:02 AM
Project Title

Reclaimed Waterline Extension Phase 3

Physical Address View project details and contacts
City, State (County) TX   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project includes: 1. Installation of two new reclaimed water pumps including pump control and SCADA. 2. Installation of sand filtration system. 3. Installation of approximately 3,310 linear feet of 12-inch pipe by open cut and non-open cut methods of construction with inline valves, air release valves, connections, and appurtenances. 4. Installation of approximately 1,200 linear feet of 8-inch pipe by open cut and non- open cut methods of construction with inline valves, air release valves, connections, and appurtenances. 5. Installation of approximately 11,500 linear feet of 6-inch pipe by open cut and non-open cut methods of construction with inline valves, air release valves, connections, and appurtenances. 6. Installation of approximately 7,140 linear feet of 4-inch and smaller pipe by open cut and non-open cut methods of construction with inline valves, air release valves, connections, and appurtenances. 7. Connection to 30-irrigation meters and relocation of 10 meters. 8. Installation of meter on existing 12-inch PVC pipe of RW from Fort Worth.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents