Similar Projects
Osseo - Neillsville Construction / CIR / Resurface
Infrastructure
Bidding
$6,000,000 CJ est. value
Neillsville, WI 54456

Osseo - Neillsville Construction / CIR / Resurface
Infrastructure
Bidding
$6,000,000 CJ est. value
Neillsville, WI 54456

Asphalt Bids
Infrastructure
Post-Bid
$400,000 est. value
Chili, WI 54420

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Withee Business Park 2021 Utility Improvements
Infrastructure
Results
Withee, WI

South 4th Street
Infrastructure
Results
$500,000 est. value
Dorchester, WI 54425

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Concrete Repair and/or Replacement at the Black River View Apartments
Infrastructure, Renovation
Post-Bid
$25,000 CJ est. value
Greenwood, WI 54437

2022 Street and Utility Improvements (West School and North Church Streets)
Infrastructure
Results
$490,000 est. value
Thorp, WI 54771

Concession Stand and Press Box
New Construction, Infrastructure
Post-Bid
$542,241 CJ est. value
Abbotsford, WI 54405

Business Park Improvements project
Infrastructure
Results
$1,674,413 CJ est. value
Owen, WI 54460

Salt Shed and Fuel Island
New Construction, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Neillsville, WI 54456

Countryside Estates Subdivision, Cedar Street (9th St. to South), 8th Street (Cedar Street to East), B Street (8th Street to 7th Street) Project
Infrastructure
Results
$609,951 CJ est. value
Owen, WI 54460

Clark County Highway Facility
New Construction, Infrastructure - 37,385 SF
Post-Bid
$12,000,000 CJ est. value
Loyal, WI 54446

Last Updated 08/19/2023 10:39 AM
Project Title

Milling, Asphalt Pavement, Base, Curb and Gutter - STH 13

Physical Address View project details and contacts
City, State (County) Abbotsford, WI 54405   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,313,763 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

20230808009 1620-03-72 Marshfield - Abbotsford, 26th Road to STH 98, STH 013 Marathon County Estimate Anticipated Funding $2,000,000 - $2,999,999 Milling, Asphalt Pavement, Base, Curb and Gutter, Sidewalk, Pavement Markings With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, banks check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Work Type: AD DBE Goal: 0% Working Day Contract: 40 Days Guaranty Required: $ 75,000.00 WI DOT - 009 - Milling, Asphalt Pavement, Base, Curb and Gutter - STH 13 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents