Similar Projects
Dunn Pond Liner Maintenance and Repairs
Bidding
Clearwater, FL

Channel 1 Concrete Panel Replacement West of 66th Street
Post-Bid
Pinellas Park, FL 33781

Channel 5 Rip Rap Repairs Project
Post-Bid
Less than $100,000 est. value
Pinellas Park, FL 33781

Pinellas Trail and 54th Avenue North Drainage Improvements (Pid # 000183A)
Results
$2,479,385 est. value
FL

Drainage Improvements for Third, Fourth, Fifth and Sixth Street BMP 3 and 4
Results
$328,559 est. value
Belleair Beach, FL 33786

Creek Shoreline Restoration
Post-Bid
Less than $600,000 est. value
Saint Petersburg, FL 33711

Palm Avenue Drainage Improvements
Results
Less than $580,000 est. value
Tarpon Springs, FL 34688

Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

Drainage Improvements
Results
Less than $181,865 est. value
FL

5440--Install Shoring for Repair Boiler Plant Column and Wall
Post-Bid
Bay Pines, FL 33744

Desilting and Video Inspection
Results
Less than $1,000,000 est. value

Bridgeway Acres Class I Landfill Ditch Slope Rehabilitation (PID 000752B)
Post-Bid
Less than $1,600,993 est. value
FL

Roosevelt Creek Channel 5 Improvements (PID 002123A)
Results
$2,235,933 est. value
Clearwater, FL 33756

Parking Lot, Bus Loop and Associated Drainage Installed
Results
Less than $150,000 est. value
Dunedin, FL 34698

SPC Stem Center Living Shoreline
Results
Less than $100,000 est. value
Saint Petersburg, FL 33733

Last Updated 04/08/2021 11:43 AM
Project Title

PPWMD Channel 1A2 Channel Improvements 49th Street North to 52nd Street North

Physical Address View project details and contacts
City, State (County) Pinellas Park, FL 33781   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,941,632
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization/Demobilization; MOT; installation of soil erosion, sedimentation, and dust control measures; installation of construction access entrance; site clearing and grubbing to include tree removal and tree trimming within the project area; remove of existing stormwater drainage pipes, mitered end sections, inlets, curb, sidewalk, endwalls, spillway, riprap, and asphalt pavement as indicated on the drawings; removal and replacement of 6 ft high chain link fence and gates; construction of vertical sheet pile walls with concrete cap at the western end of the project at 52nd Street North; construction of a concrete retaining wall along the northern side of the channel at the western end of the project; construction of concrete channel panels and channel bottom between Sta 10+55 to Sta 20+20; installation of underdrain weep hole system as indicated on drawings; installation of (12 ft x 4 ft) precast concrete box culvert between Sta 20+20 to Sta 22+32; construction of concrete box culvert headwall at Sta 20+20; grading and sodding of the treatment area between Sta 20+20 to Sta 22+70; installation of a concrete baffle box at the eastern end of the project per Oldcastle Infrastructure (Suntree Technologies, Inc.) plans; construction of (8 ft x 4 ft) concrete box culvert extension from eastern end of the concrete baffle box to western end of the existing (8 ft x 4 ft) concrete box culvert at 49th Street North; installation of concrete inlets, manholes, pipes, curb, flume, and sidewalk; temporary and permanent curb cut; removal and replacement of existing wood fence at the eastern end of the project for site access; relocation of existing fence column at eastern of the project; excavation, removal, and offsite hauling of on-site soil; re-grade and sodding of the northern and southern sides of channel top of bank area from the western to the eastern project extents; dewatering and bypass pumping; continuous noise and vibration monitoring during construction operations; protection of existing watermain during all construction operations; perform general site work associated with the improvements listed above; and all related work for a complete and operable drainage system.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents