Similar Projects
Water System Improvement - Contract II - Storage Tank Rehabilitation
Infrastructure
Bidding
Chidester, AR

Fish Hauling Tanks
Infrastructure
Results
Little Rock, AR

Rehabilitate an Existing 150,000-Gallon Elevated Water Storage Tank
Infrastructure
Post-Bid
Mountain View, AR

Water System Improvements
Renovation
Post-Bid
Kingsland, AR 71652

Construction – Round Mountain Standpipe
Infrastructure
Results
Fayetteville, AR 72701

Township Tank Improvements
Infrastructure
Results
Fayetteville, AR

Z--Paint Inside and Outside of Water Tanks
Term Contract
Design
$100,000 to $250,000 est. value
Harrison, AR

East End 2021 Water Improvements Contract 1 – Water Storage Tank
Infrastructure
Post-Bid
Little Rock, AR

Last Updated 09/16/2021 10:55 AM
Project Title

Tank Painting and Rehab

Physical Address View project details and contacts
City, State (County) Cabot, AR 72023   (Lonoke County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The water storage tanks shall be cleaned, coated and repaired in accordance with ANSI/AWWA D102-11 standard specification for Coating Steel Water Storage Tanks and AWWA D100 standard for Welded Steel Storage Tanks for Water Storage. B. Work includes preparation of surfaces which are to receive finishes; collection, handling and disposal of debris; tank repairs; finishes for surfaces; testing and cleaning. C. The Contractor shall clean the interior of the tanks, removing all sludge accumulations and other materials. Dispose of material removed in accordance with applicable laws and ordinances. D. All exterior and interior tank surfaces shall be painted. All water shall be drained from the tanks and riser prior to interior and/or exterior surface preparation and painting. E. Color selection shall be determined by the Owner. F. Intermediate coats should be slightly tinted so as to provide better definition of coverage by the final coat. All interior wet coatings shall be NSF approved. G. The Contractor shall schedule draining and removing the tanks from service with the Owner. The Owner shall operate all distribution system valves. The Contractor shall not open or close any valves or otherwise affect the water distribution system without permission of the Owner. H. The Contractor shall be responsible for all costs associated with sampling, worker protection, environmental pollution control, handling of debris, laboratory analysis and waste disposal.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.