Similar Projects
Mechanical and Chemical Vegetation Control Project
Term Contract
Post-Bid
Clewiston, FL 33440

Quality Assurance (QA) Seeding
Post-Bid

F--Wetlands Restoration/Maintenance
Results
West Palm Beach, FL 33410

F--Service: Wetlands Maintenance
Results
West Palm Beach, FL 33410

Mitigation Implementation Project
Post-Bid
Panama City, FL 32409

Lake Aeration System Inspections, Maintenance, Repairs and Equipment Purchase
Term Contract
Results
Less than $195,000 est. value
Orlando, FL 32801

Annual Lake and Canal Cleaning and Maintenance
Term Contract
Post-Bid
North Miami Beach, FL 33162

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Jones Pier Wetland Restoration and Conservation Improvements
Results
Gifford, FL 32960

Lake Apopka Marsh Flow-Way Wetland Planting
Results
Less than $40,000 est. value
Palm Bay, FL 32909

Lake Jesup Nurtrient Reduction and Flow Enhancement
Results
Less than $1,100,000 est. value
Palatka, FL 32178

Disaster Mitigation and Remediation Services
Results
Panama City, FL 32405

Marina Soil and Groundwater Removal
Results
Less than $45,000 est. value
West Palm Beach, FL

Robinson Preserve Expansion Phase IIB Restoration
Results
Bradenton, FL 34205

Wetlands Maintenance
Results
Sunrise, FL 33326

Reported 01/04/2021 09:00 AM
Project Title

Comprehensive Everglades Restoration Program Biscayne Bay Coastal Wetlands - Phase I Project, L-31 Flow-way Pump Station S-709, Miami-Dade County, Florida

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method
Project Status Construction Commenced
Bids Due View project details and contacts
Estimated Value $3,000,000 to $8,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Biscayne Bay Coastal Wetlands Phase 1 project includes construction activities associated with the construction of one electric powered pump station designated as S-709. S-709 is a 40 cfs pump station located north of the C-103 canal on the L-31E canal. S-709 will pump water from the C-103 canal and discharge to the north into the L-31E canal using (2) 20 cfs submersible pumps. Pump station S-709 will also have a sixty inch culvert with a slide gate to pass flows during emergencies when the pump station is not operable. The pump station consist of sheet pile headwalls and wingwalls, with precast concrete intake boxes that are placed in the wet between the sheet pile headwalls. Flowable fill is placed between the precast boxes and sheet pile headwalls. A precast concrete deck is positioned over the precast boxes and concrete cap. In water construction utilizing divers will be necessary, because dewatering is difficult due to the local geology and high conductivity. The pump station has a trash rack on the intake side and flap gates on the discharge side. The culvert consists of a 60 inch HDPE diameter pipe that will be encased by flowable fill placed underwater. The culvert headwalls are precast concrete placed in the wet and grouted between two steel king piles. A stainless steel slide gate is mounted to the headwall and is operated by an electric actuator. Controls will be located in a standalone precast concrete building located adjacent to the pump station structure. Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, precast concrete, cast-in-place concrete, tremie concrete, flowable fill, HDPE culvert, slide gate, precast control building, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing. Construction activities also include excavation, backfilling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone. Construction activities also includes installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents