Similar Projects
Washington Street Improvements from Garnett Road to Olive Avenue
Infrastructure
Post-Bid
Broken Arrow, OK

Cedar Springs Estates Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work
Infrastructure, Alteration
Post-Bid
$1,115,000 est. value
Broken Arrow, OK

Pavement Rehabilitation (p.c.) and Bridge Rehabilitation
Results
Tulsa, OK

Safety Improvement
Results
Tulsa, OK

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work 3
Infrastructure
Results
$809,281 est. value
Broken Arrow, OK

Southbrook Concrete Roadway Panel Replacement
Infrastructure, Alteration
Post-Bid
$1,800,000 est. value
Broken Arrow, OK

East Elementary Driveway Entrance Improvements
Alteration
Results
Tulsa, OK 74137

Citywide Arterial Asphalt Overlay
Infrastructure
Post-Bid
Tulsa, OK

Elgin Street Improvements from 1st Street to 5th Street
Infrastructure
Results
Less than $407,417 est. value
Broken Arrow, OK

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Chip Seal (Double Treatment)
Infrastructure
Results
Tulsa, OK

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Pavement Striping
Infrastructure
Results
Owasso, OK 74055

Slabjacking and Subsealing Services
Infrastructure, Alteration
Post-Bid

Last Updated 12/07/2021 07:25 AM
Project Title

Melody Lane, Union Avenue and Country Lake Estates Milling Project

Physical Address View project details and contacts
City, State (County) Jenks, OK   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Said Construction shall be to asphalt mill 2" depth within Melody Lane Addition (Forest Street from "C" Street to "K" Place, "F" Street from Forest Street to Elm Street, Koa Street from Main Street to "C" Street, "C" Street from Koa Street to End of Houses); Union Avenue (96th Street to 91st Street) and Country Lake Estates (18th Circle, 18th Street from 18th Circle to Florence Avenue, 122nd Street from 18th Avenue to 122nd Street, 18th Avenue from 123rd Street to 122nd Street and 18th Court from 18th Avenue to End of Cul-de-sac). An estimated 32,910 square yards of existing pavement will need to be milled. Traffic Control and scheduling limits of no access to street will be based on door-to-door notification of affected residents at least 48 hours in advance. This project includes all associated appurtenances, labor, materials, equipment, supplies, services and related items in the specifications and as designed. This work will be done in conjunction with Tulsa County overlay project. Contract will be in effect for twelve (12) months or until project is finalized, whichever occurs first.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents