Similar Projects
API 653 External Tank Inspection
Bidding

API 653 External Tank Inspection
Bidding

Water Tank Recoating 2019
Post-Bid
Less than $150,000 est. value
Jacksonville, OH

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

0.5 MG Elevated Water Storage Tank
Results
$1,590,000 est. value
Tipp City, OH

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

SR 45 Corridor Improvements Elevated Water Tank
Bidding
$16,155,000 est. value
Lordstown, OH

Multistack Preventative Maintenance
Term Contract
Post-Bid
Columbus, OH 43207

Contract I: Procurement of two hundred (200) Grinder Pump Cores, Controls and Appurtenances
Results
Hillsboro, OH 45133

Contract A- North Baltimore Waterline Improvements and Contract B- 500000 Gallon Elevated Water Storage Tank
Bidding
$741,000 to $1,886,000 est. value
North Baltimore, OH

Replace Hydrant Fuel System at Wright-Patterson Air Force Base
Post-Bid
$10,000,000 to $25,000,000 est. value
Wright Patterson Air Force Base, OH 45433

H--Annual Water Tank Cleaning and Inspection | Base +4 OYs
Results
Chillicothe, OH

Elevated Tank Rehabilitation
Bidding
Less than $221,375 est. value
Elmore, OH

Elevated Storage Tank Improvements
Post-Bid
Less than $1,500,000 est. value
Archbold, OH

Dogwood Reservoir Rehabilitation
Results
Less than $388,198 est. value
Dayton, OH 45390

Last Updated 05/04/2020 10:05 AM
Project Title

WRRF 4.7 Million Gallon Sludge Tank Project

Physical Address View project details and contacts
City, State (County) Wooster, OH 44691   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Contract A consists of excavating for the proposed tank, placing the excavated material on the property to the north, constructing the concrete foundation and wall, placing the center support column, and backfilling. Contract B and C consist of installation of the sludge storage tank, tank roofing system, associated piping, electrical and any other incidentals associated with the tank installation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents