Similar Projects
Re-Design Swim and Fitness Center
Renovation, Addition, Alteration
Conception
Westminster, CO 80030

Mestizo-Curtis Pool Reconstruction - 2021 Bond - City of Denver
Renovation
Conception
$6,050,000 CJ est. value
Denver, CO 80205

Design Build Services for Stadium and Pool
Design
Colorado Springs, CO

Thompson Thrift Multi-Family Residential Development
New Construction, Infrastructure - 1,111,044 SF
Design
Monument, CO 80132

Fruita Community Center Aquatic Upgrades
Infrastructure
Post-Bid
Fruita, CO 81521

Pool Resurfacing
Alteration
Post-Bid
Aurora, CO 80016

Recreation Center-Leisure Pool Leak Detection/ Repairs and Pool Re-Plaster
Infrastructure
Results
Less than $520,000 est. value
Longmont, CO 80501

Community Center Pool Repairs
Alteration
Results
Glenwood Springs, CO

Lodge at Black Forest Phase ll
New Construction - 375,358 SF
Construction
$10,000,000 est. value
Colorado Springs, CO 80908

Twin Peaks Lodge and Spa
Renovation, Addition
Construction
Ouray, CO 81427

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

The Savoy
New Construction, Infrastructure
Conception
$94,306,100 CJ est. value
Fort Collins, CO 80528

Flats at Hansen Farm
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Fort Collins, CO 80528

Hinkley Pool Deck Restoration
Alteration
Post-Bid
CO 80011

Last Updated 06/09/2023 02:05 PM
Project Title

FunPlex Pool Deck Resurface - N749 - City of Greeley

Physical Address View project details and contacts
City, State (County) Greeley, CO 80634   (Weld County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $400,999 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface pool deck and replace drains around the pool area. Concrete removal and repour may be required to replace drains on the pool deck. This may also include drains into the entry of each locker room. The deck surface will be cleaned and etched and will remain concrete. Wider drains may be needed as well. As June 9, 2023, this project is included in the City of Greeley's FY 2023 - 2027 CIP and funding for construction is allotted for FY 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents