Similar Projects
Capital Commerce Center
New Construction, Demolition - 1,100,000 SF
Conception
$30,000,000 est. value
Sacramento, CA 95824

Life Storage Expansion
New Construction - 55,367 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Elk Grove, CA 95624

Greenspace Self Storage
New Construction - 135,228 SF
Design
$10,000,000 CJ est. value
Elk Grove, CA 95624

Easton Research Park West Sitework and Demolition
Demolition
Design
Rancho Cordova, CA 95742

La Sierra Well Construction Project
Infrastructure
Bidding
$650,000 CJ est. value
Carmichael, CA 95608

Folsom Hydraulic Cylinder Replacement (HCR)
Infrastructure
Bidding
$25,000,000 CJ est. value
Folsom, CA 95630

The Lyla Apartments
New Construction, Infrastructure
Sub-Bidding
$75,000,000 CJ est. value
Elk Grove, CA 95624

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

Folsom Ranch Medical Center Concrete & Electrical
Alteration
Post-Bid
Folsom, CA 95630

On-Call Drilling and Well Installation Services for City Landfills
Term Contract, Alteration
Results
Sacramento, CA

Construction Management, Inspection, and Materials Testing for the Arcade-Cripple Creek Trail Project
Infrastructure
Results
$8,466,021 CJ est. value
Citrus Heights, CA 95610

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Greenspace Self Storage
New Construction - 135,187 SF
Construction
$10,000,000 CJ est. value
Elk Grove, CA 95624

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Last Updated 11/03/2022 12:05 PM
Project Title

Tributary Point Self-Storage

Physical Address View project details and contacts
City, State (County) Rancho Cordova, CA 95670   (Sacramento County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for three self-storage buildings. As of November 2022, this project is in the early planning stages, and received approval from the County of Sacramento. No further plans or applications have been submitted for review at this time. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 136,928 SF - 3 Stories Above Grade, 124,650 SF. 1 Story Above Grade, 9,014 SF. 1 Story Above Grade, 3,264 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents