Similar Projects
RFQ - Civil Engineer, Environmental Engineer and Airport Planner
Term Contract
Conception
Moss Point, MS 39563

Water Systems Improvement Project
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Ocean Springs, MS

Fountainbleau Subdivision / Ocean Springs
New Construction, Infrastructure
Design
$95,869,480 CJ est. value
Ocean Springs, MS 39564

Demolition & Renovations of Canopies, Phase 2
Demolition, Renovation, Infrastructure
Bidding
$3,900,000 CJ est. value
Gautier, MS 39553

Grierson Street Drainage Improvements
Infrastructure
Bidding
$2,600,000 CJ est. value
Moss Point, MS 39563

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Vancleave Fire Station
New Construction, Renovation, Infrastructure - 3,600 SF
Post-Bid
$300,000 CJ est. value
Vancleave, MS 39565

Replacement of 10 Industrial Waterline on Highway 611
Infrastructure
Results
$394,700 CJ est. value
Pascagoula, MS 39581

Replacement of 10 Industrial Waterline on Highway 611
Infrastructure
Results
$394,700 CJ est. value
Pascagoula, MS 39581

Gautier Vancleave Road Wastewater System Upgrades
Renovation
Construction
$2,683,000 CJ est. value
Gautier, MS 39565

Bluff Creek Hills
New Construction, Infrastructure
Pending Verification
$46,000,000 CJ est. value
Moss Point, MS 39562

The Serene at St. Martin Townhome Development
New Construction, Infrastructure
Pending Verification
$53,000,000 CJ est. value
Gulf Hills, MS 39564

St. Andrews Subdivision
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Ocean Springs, MS 39564

Griffin Street and Grant Street Drainage Project
Infrastructure
Bidding
$500,000 CJ est. value
Moss Point, MS 39563

North Rail Connector Mitigation Project
Infrastructure
Post-Bid
$125,000 CJ est. value
Pascagoula, MS 39567

Last Updated 10/17/2023 04:31 AM
Project Title

Automated Water Meters

Physical Address View project details and contacts
City, State (County) Moss Point, MS 39563   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

proposals for the supply and installation of an AMI Water Meter System. Neither Owner nor Engineer will be responsible for Proposal Documents, including addenda, if any, obtained from sources other than the designated electronically General water meter requirements: 1. Water meters that provide integrated, time interval data not less than hourly. 2. Water meters that replace existing water meters and increase the accuracy of the reads. associated with the system through use of modern ultrasonic technology-based products. 3. Water meters that improve the efficiency of the water system, lower operating costs, and aid in customer service. 4. Water meters that use an Exclusive/Primary Licensed FCC Frequency, or equivalent, to enable robust operation, high-capacity bandwidth, interoperability with current and future applications and future cellular network upgrades. 5. Water meters or RF solutions that provide leak detection on the customer side of the meter. 6. The system must be capable of operating in both AMI fixed network and AMR drive-by as a back-up system should the AMI infrastructure become inoperable WITHOUT physically changing out any part of the meter or physical manipulation to the meter. 7. Water meters that only offer AMR functionality (drive-by reading) will not be considered. Water meters that must change a Radio Signal Device, Meter Transmitting Unit (MTU), or similar component to switch from AMI to AMR will not be considered 8. The meter must not have registers that need replacement or utilize endpoints to be affixed to meter. For all meters 5/8" to 12": 1. All cold-water meters must use solid state measuring technology with no moving parts. 2. All sensors and electronics shall be designed so that no direct exposure is made with water. 3. Meters shall be produced in an ISO 9001C facility. 4. All meters shall be manufactured from either composite or stainless steel, brass meters will not be considered. 5. All sensors shall be completely separated from the fluid, and coatings and water quality shall not affect measurement accuracy or warranty. For meters 5/8" and 1": 1. The 5/8" and 1" meters shall have the ability to listen for leaks on the upstream side of the meter. 2. Each meter shall include all components necessary to listen for noise levels on service and distribution lines for the purpose of locating potential leaks in the piping. The acoustic leak detection sensor and electronics must be integral to the meter, requiring no external hardware or wired connections. 3. The meter shall collect noise data from the water column. 4. All meters must have a minimum operating working pressure of 250 PSI.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents