Similar Projects
Last Updated | 10/06/2023 08:35 AM |
Project Title | Stadium View Subdivision |
Physical Address | View project details and contacts |
City, State (County) | Manning, IA 51455 (Carroll County) |
Category(s) | Entertainment/Recreation, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Stadium, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $578,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: Located south of 10th Street between Maple Drive and Concord Avenue. The Stadium View Subdivision Project includes the addition of 36 residential lots, comprising of 20 pocket neighborhood lots and 16 traditional lots, located south of 10th Street between Maple Drive and Concord Avenue. Work covered under these contract documents include pavement removal; subgrade preparation; new pavement installation; full depth patching; driveway installation; shared-use path and ADA curb ramp installation; and construction survey. These contract documents exclude excavation; grading; sidewalk installation; granular surfacing; complete utility installation including water main, storm sewer, and sanitary sewer; installation of sanitary sewer service stubs; erosion control; and seeding. Contractor shall fully complete the project no later than November 30 th, 2023 |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |