Similar Projects
Heritage & Paddock Parks Renovations & Site Improvements
Infrastructure
Conception
$13,500,000 est. value
Fort Worth, Keller, TX 76248

Windhaven Road - ST2213 - City of North Richland Hills
Infrastructure
Conception
$1,189,116 est. value
North Richland Hills, TX 76182

Wingate
New Construction - 14,384 SF
Design
Fort Worth, TX 76107

Vista West II, Phase 2
New Construction, Infrastructure - 3,312,000 SF
Design
$6,000,000 est. value
Fort Worth, TX 76108

DPS Outdoor Range Upgrades
New Construction, Infrastructure - 8,545 SF
Bidding
$6,597,777 CJ est. value
DFW Airport, TX 75261

Murphy Express #8992 / Fort Worth
New Construction, Infrastructure - 2,899 SF
Bidding
$1,500,000 CJ est. value
Fort Worth, TX 76116

Install Traffic Signal
Infrastructure
Sub-Bidding
$1,515,865 CJ est. value
Fort Worth, TX 76164

Summer Creek - Lot 9
New Construction, Infrastructure - 12,500 SF
Sub-Bidding
$2,600,000 CJ est. value
Fort Worth, TX 76102

2021 Street Crack Sealing Project
Post-Bid
Dalworthington Gardens, TX 76016

Lake Street Between Pond Street and Tarrant Street, Drainage and Water Improvements
Post-Bid
$186,300 est. value
Mansfield, TX 76063

Water System Improvements for Enon Avenue and Christopher Drive
Results
$1,757,958 est. value
Everman, TX 76140

Waterline Improvements for 3rd Street (North Road to Cory A Edwards Drive)
Results
$444,000 est. value
Kennedale, TX

Key School
New Construction
Construction
Fort Worth, TX 76119

The Watercress Amenity Center & Site Development
New Construction
Construction
Haslet, TX 76052

South Crest Drive - ST2216 - City of North Richland Hills
Alteration
Conception
$358,800 est. value
North Richland Hills, TX 76182

Last Updated 07/22/2022 04:07 AM
Project Title

Martin Drive Storm Drain Improvements

Physical Address View project details and contacts
City, State (County) Bedford, TX 76021   (Tarrant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $323,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the installation of 4,384 square feet of sidewalk pavement, 361 cubic yards of 18- inch stone grouted rock riprap, 24 LF of 24-inch storm drain pipe and 64 LF of 48-inch storm drain pipe with associated inlets, headwalls, handrails and earthwork. A bid bond in the amount of five percent (5%) of the bid, issued by an acceptable surety, shall be submitted with each bid. Any questions or requests for information regarding this project during the bid process should be directed through the project page. Alternatively, questions may be sent to David Smith, PE at 817-764-7486 or dsmith@halff.com or Emmit Perley, PE at 682-229-2520 or eperley@weatherfordtx.gov. Engineer will distribute to prospective bidders of record such Addenda as Engineer considers necessary in response to discussions or inquiries arising during the bid process. The deadline to ask questions is 7/18/2022 8:00 AM CST Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times. Contractor and Owner recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $ 250.00 for each day that expires after the time specified in Paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect,refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $ 75.00 for each day that expires after the time specified in Paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. The City reserves the right to reject any and all bids received.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents