Last Updated | 07/22/2022 04:07 AM |
Project Title | Martin Drive Storm Drain Improvements |
Physical Address | View project details and contacts |
City, State (County) | Bedford, TX 76021 (Tarrant County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $323,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project generally consists of the installation of 4,384 square feet of sidewalk pavement, 361 cubic yards of 18- inch stone grouted rock riprap, 24 LF of 24-inch storm drain pipe and 64 LF of 48-inch storm drain pipe with associated inlets, headwalls, handrails and earthwork. A bid bond in the amount of five percent (5%) of the bid, issued by an acceptable surety, shall be submitted with each bid. Any questions or requests for information regarding this project during the bid process should be directed through the project page. Alternatively, questions may be sent to David Smith, PE at 817-764-7486 or dsmith@halff.com or Emmit Perley, PE at 682-229-2520 or eperley@weatherfordtx.gov. Engineer will distribute to prospective bidders of record such Addenda as Engineer considers necessary in response to discussions or inquiries arising during the bid process. The deadline to ask questions is 7/18/2022 8:00 AM CST Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times. Contractor and Owner recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $ 250.00 for each day that expires after the time specified in Paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect,refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $ 75.00 for each day that expires after the time specified in Paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. The City reserves the right to reject any and all bids received. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |