Similar Projects
Pure Lane Mixed Use
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Crystal River, FL 34429

Sidewalk - Legrone to Copeland Improvement - City of Crystal River
Infrastructure
Conception
$250,000 CJ est. value
Crystal River, FL 34428

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Cardinal Oaks
New Construction, Infrastructure
Design
$10,600,000 CJ est. value
Homosassa Springs, FL 34448

Tidal Wave Auto Spa / Lecanto
New Construction, Infrastructure - 3,120 SF
Bidding
$800,000 CJ est. value
Lecanto, FL 34461

Resurfacing
Infrastructure
Bidding
$5,929,700 CJ est. value
Inverness, FL 34453

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

East Turner Camp Road from East Bank Road to East Matthew Meadow Court
Infrastructure
Post-Bid
$1,281,234 CJ est. value
Inverness, FL 34453

Brentwood Wastewater Treatment Facility to Meadowcrest Wastewater Treatment Facility Diversion Project
Renovation, Infrastructure
Results
$1,878,830 CJ est. value
Lecanto, FL 34461

Technical Conservation Group (TCG) Sewer Community Development Block Grant (CDBG) Project
New Construction
Results
$515,200 est. value
Lecanto, FL 34461

Crystal River Dialysis Center
New Construction, Renovation, Addition - 10,200 SF
Construction
$2,200,000 est. value
Crystal River, FL 34429

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

CR 491 Next-Phase Road Widening Project
Infrastructure
Pending Verification
$13,060,332 CJ est. value
Lecanto, FL 34461

Northern Turnpike Connector - Florida Department Of Transportation
Infrastructure
Pending Verification
$30,000,000 CJ est. value
Lecanto, FL 34461

Floral City Elementary Kitchen/Cafe Renovation/Remodel and Expansion
Addition, Demolition, Build-out, Renovation, Infrastructure
Bidding
$385,000 CJ est. value
Floral City, FL 34436

Last Updated 01/18/2023 10:43 AM
Project Title

Bicentennial Park Sewer Construction Project

Physical Address View project details and contacts
City, State (County) Crystal River, FL 34428   (Citrus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

BICENTENNIAL PARK SEWER CONSTRUCTION PROJECT Citrus County, Florida ( County ) invites interested parties to submit a Bid to provide complete construction of the Bicentennial Park Sewer Improvement Project to include 4 grinder pump lift stations, 1,596 feet of 2 DR 11 Poly Pipe, and 1,947 feet of 3" DR 11 Poly Pipe along with air release valves, and restoration along force main route. All work shall be in accordance with the construction plans, special provisions, and contract documents. Minimum Requirements for Submitting a Bid Bidder shall meet, at a minimum, one of the following requirements to be determined a responsive and responsible Bidder at the time of Bid Submittal: 1. Certified General Contractors License 2. Underground Utility Contractor License Security Bond of 5% of Bid amount **All public Meetings are subject to change or can be cancelled due to the current events. Any person requiring reasonable accommodation at this meeting because of a disability or physical impairment should contact the County Administrator's Office, 3600 W. Sovereign Path, Suite 267, Lecanto, FL 34461, (352) 527-5210, at least two days before the meeting. If you are hearing or speech impaired, dial 7-1-1, 1-800-955-8771 (TTY) or 1-800-955-8770 (v), via Florida Relay Service. English Translation: (If you need a Spanish Translator, please make arrangements with the County by telephone within two days of the publication notice at 352-527-5370)

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents