Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Outbound Charging Station Substation Foundation / Rivian Automotive
New Construction, Infrastructure
Design
$706,965 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Patching on I-55
Infrastructure
Bidding
$500,000 CJ est. value
Bloomington, IL 61701

Patching on I-55
Infrastructure
Bidding
$500,000 CJ est. value
Bloomington, IL 61701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Ground Maintenance of Public Park
Alteration
Post-Bid
Colfax, IL

2022 Non-MFT Construction Sections
Infrastructure
Results
IL

5.36 Miles on FAI 55 (I-55), Class A Special Patching from SW of Bloomington to S of Shirley. 0.92 Mile on FAU 6406 (US 150), Class B Patching from Veteran's PKWY to just S of Woodrig Rd. 0.28 Mile on FAP 708 (US 51 BUSN), Class B Patching from US 51 to 0.3 Mile S of US 51
Infrastructure
Results

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Constitution Trail Extension - Lafayette Street to Hamilton Road - 40100100-70051 - City of Bloomington
Infrastructure
Conception
$320,000 CJ est. value
Bloomington, IL 61704

Street Maintenance - Heat Scarification, Sealcoating and Fog coating
Infrastructure
Post-Bid
Hudson, IL

Last Updated 07/24/2023 09:36 AM
Project Title

Longitudinal Joint Repair

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61705   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1.34 mi of longitudinal joint repair W of Colton Ave to Empire Crossing in Bloomington. bids will be publicly opened from the iCX SecureVault Region 3 District 5 Federal Project # N/A County(s) McLean Key Route(s) FAP 693 Marked Route(s) IL 9 Section(s) (FR)I-2 State Job #(s) C-92-037-18 PPS #(s) 0-02178-5007 Completion Date is 15 Working Days Questions not accepted as of July 25, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 039-Longitudinal Joint Repair - IL 9

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents