Similar Projects
Talbot School Basketball Court Reconstruction and Culvert Replacement Project
Renovation, Infrastructure
Bidding
Portland, ME

Large Culvert Replacement
Infrastructure
Bidding
ME

Culvert Pipe
Post-Bid
Portland, ME

Secondary Clarifier Splitter Structure Gate Replacement
Post-Bid
South Portland, ME

West Street Culvert Replacement
Results
Freeport, ME 04032

Willard Beach Storm Drain Outfall Replacement
Results
South Portland, ME

Supply and Delivery of a Precast Concrete Box Culvert
Results
Gorham, ME 04038

Riverton Culvert Rehabilitation Project
Results
Less than $1,045,000 est. value
Portland, ME

Large Culvert Replacement
Results
Gorham, ME 04308

Emergency Vehicle Ramps - Forest Avenue Overpass Mile 50.0 and Culvert and Drainage Repairs Mile 53.7
Results
Less than $750,000 est. value
Portland, ME

Woods Road Culvert Rehabilitation
Results
Falmouth, ME

Two Bartlett Brook Stream Crossing Upgrades
Results
Naples, ME

Large Culvert Replacement
Results
Less than $426,000 est. value
Cumberland, ME 04021

Large Culvert Replacement
Results
Less than $645,000 est. value
Bridgton, ME 04009

Underwood Road Drainage System Improvements
Results
Less than $500,000 est. value
Falmouth, ME

Last Updated 05/26/2021 09:47 AM
Project Title

Retaining Wall Replacement and Fence Project along Yellowbird Road

Physical Address View project details and contacts
City, State (County) Portland, ME 04102   (Cumberland County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Fencing, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $290,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Retaining Wall Replacement and Fence Project along Yellowbird Road Location: Portland International Jetport Yellowbird Road, Portland, Maine Outline of Work: Provide all labor, materials, equipment and incidentals necessary for the replacement of a retaining wall north of the Runway 18 end along Yellowbird Road, and replacement of fencing along Yellowbird Road. Work includes removal and replacement of the existing retaining wall, fencing, installation of curbing, pavement, gravels, riprap, traffic control, and other items.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents