Similar Projects
Last Updated | 12/07/2021 03:48 PM |
Project Title | Construction of the Sanitary Sewer System Rehabilitation Program |
Physical Address | View project details and contacts |
City, State (County) | Columbus, GA (Muscogee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the Cured-In-Place Pipe method and manhole rehabilitation. Cured-In-Place Pipe is predominantly 8-inches and 10-inches in diameter, with a magnitude estimated to be up to 20,510 feet. Manhole rehabilitation is predominantly Level C lining with an estimated quantity up to 360 VF. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |