Similar Projects
HVAC Upgrades for City Hall and Public Works
Alteration
Bidding
$300,000 est. value
Waukegan, IL

Sheriff Community Based Corrections Center (CBCC) and Adult Detention Center Tower Roof Replacements
Alteration
Bidding
$750,000 est. value
Waukegan, IL

Annual Generator Preventative Maintenance Intent
Post-Bid
Grayslake, IL

2020 HVAC Preventative Maintenance Services
Term Contract
Post-Bid
Fox Lake, IL

Building 310 Exhaust Fan
Results
Gurnee, IL

2021 HVAC Upgrades Diamond Lake School
Results
Mundelein, IL

Construction Manager - CMGC Services - HVAC Replacement System - South Park Elementary School
Alteration
Bidding
$3,000,000 est. value
Deerfield, IL 60015

HVAC and Mechanical Products
Term Contract
Post-Bid

Leisure Center HVAC Roof-Top Unit
Results
Zion, IL 60099

2021 HVAC Upgrades at Antioch Community HS
Post-Bid
Lake Villa, IL

Site Sign Electrical and Site Lighting Replacement Intent
Results
Grayslake, IL

2021 Rooftop Unit Replacement
Post-Bid
Antioch, IL 60002

Mechanical HVAC System Replacement
Results
Wauconda, IL 60084

Rooftop Solar Panel Installation and Operations
Post-Bid
Highland Park, IL 60035

Cook Park Library Stand-By Generator
Results
Libertyville, IL 60048

Reported 05/20/2022 09:21 AM
Project Title

E Building HVAC/Electrical

Physical Address View project details and contacts
City, State (County) Grayslake, IL 60030   (Lake County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes: Execute cutting (including excavating), filling or patching of work, required to: Make several parts fit properly. Uncover work to provide for installation of ill-timed work. Remove and replace defective work. Remove and replace work not conforming to contract requirements. Remove samples of installed work as specified for testing. Install specified work in existing construction. 2. In addition to contract requirements, upon written instructions of Architect/Engineer. Uncover work to provide for observation of covered work. Remove samples of installed materials for testing. Remove work to provide for alteration of existing work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents