Similar Projects
Repavement of the Streetscape and Flag Pole Installation at the Justice Center
Infrastructure, Alteration
Bidding
Clayton, MO 63105

Repair Parking Lot and Loading Dock Infrastructure
Infrastructure
Bidding
Rolla, MO 65401

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

Main Park and Heritage Park Sidewalk
Post-Bid
Washington, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

Trail Improvements on the Osage Trail Levee
Infrastructure
Bidding
Warsaw, MO

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Post-Bid
Gladstone, MO

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

West Meyer Road Phase 3
Infrastructure
Bidding
Wentzville, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

Last Updated 08/18/2021 03:15 PM
Project Title

Memorial Park Trail

Physical Address View project details and contacts
City, State (County) Joplin, MO   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes construction of a new concrete trail with 4-inches of PCCP over 4-inches of Type 1 Aggregate Base. Associated work will include earthwork, including subgrade compaction, finish grading, placement of 4-inches of topsoil over disturbed areas, and vegetative restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents