Similar Projects
Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Sunfield Phase 3 Section 6A Street, Drainage, Water, Wastewater, and Utility Improvements, The Sunfield Phase 3 Section 6B Street, Drainage, Water, Wastewater, and Utility Improvements; Sunfield Phase
Post-Bid
Buda, TX

Replace Influent Chiller-2019
Results
$95,000 to $108,000 est. value
San Marcos, TX 78666

Z--San Marcos Pond Yard Water Valves Replacement
Results
$100,000 to $250,000 est. value
San Marcos, TX 786661024

Construction Package #3 - Waterline Improvements & ARV Installation
Post-Bid
Less than $3,360,000 est. value
San Marcos, TX 78666

Trails at Windy Hill Phase 2
Results
TX

Sunfield Phase 3 Section 5C Street Improvements and Sunfield Phase 3 Section 5C Drainage, Water, Wastewater, and Utility Improvements
Post-Bid
TX

Blanco River Waterline Improvements
Results
San Marcos, TX 78666

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Post-Bid
Dripping Springs, TX 78620

Main Lift Station Force Main Replacement
Results
$7,400,000 est. value
San Marcos, TX 78666

2020 CCSUD TWDB Projects Scada Consultant Services
Post-Bid
San Marcos, TX 78666

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Plum Creek Marketplace Avenue Phase 2 - Water, Wastewater, Drainage, and Paving Facilities
Post-Bid
TX

Sportsplex Wastewater Line Upsize Project
Results
Less than $253,902 est. value
Buda, TX 78610

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Last Updated 10/23/2020 10:43 AM
Project Title

Cotton Gin Road Water Line Relocation - Phase 1

Physical Address View project details and contacts
City, State (County) Uhland, TX 78640   (Hays County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of, but is not limited to the following: Furnish and install 2,000 L.F. of 12-inch PVC Water Line including two road crossings to be installed in bored steel casing. The project will also include open cut steel casing, service line extensions and water meter relocations, driveway repairs and water line tie-in. The project will be replacing a 3-inch water line that is impacted by ROW acquisition of the County. Roadway construction along Cotton Gin Road may be in progress during the project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents