Similar Projects
Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 est. value
Urbandale, IA 50322

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 est. value
Urbandale, IA

Southfork Drive Culvert Repairs
Infrastructure
Design
$163,316 CJ est. value
Waukee, IA 50263

10th Street & Sunrise Dr Phs II A Improvements
Infrastructure
Design
$13,300,000 est. value
Waukee, IA

Woodward Resource Center (WRC) Medical Center Fire Sprinkler
New Construction, Infrastructure
Bidding
$350,000 CJ est. value
Woodward, IA 50276

Iowa Veterans Cemetery Asphalt Milling and Replacement
Infrastructure
Bidding
$4,000,000 CJ est. value
Adel, IA 50003

Street Repair Retainer
Term Contract, Infrastructure
Post-Bid
West Des Moines, IA

Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Post-Bid
$25,000,000 CJ est. value
Johnston, IA 50131

Valley Junction Levee Trail Connection
Infrastructure
Results
West Des Moines, IA

Douglas Parkway Extension
Infrastructure
Results
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

156th Street and Waterford Road - TR19-01 - City of Urbandale
Infrastructure
Conception
Urbandale, IA 50323

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

Ute Avenue and Ashworth Road Intersection Improvement
Infrastructure
Results
$5,485,000 est. value
Waukee, IA

170th Street Alice s Road Meredith Drive to Waterford Road - ST16-03 - City of Urbandale
Infrastructure
Conception
$6,759,500 est. value
Urbandale, IA 50323

Last Updated 08/05/2022 06:08 PM
Project Title

2022 Water Main Replacement Perry Water Works

Physical Address View project details and contacts
City, State (County) Perry, IA 50220   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $596,592 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the 2022 Water Main Replacement, and work incidental thereto, as described in the plans and specifications Proposals will be acted upon by the Board of Trustees of said Perry Water Works in the Perry Water Works Building at 8:00 A.M. on the 11 th day of August, 2022, or at such later time and place as then may be fixed. The work to be done is as follows: 2022 Water Main Replacement BASE BID Construct the 2022 Water Main Replacement including all labor, materials and equipment necessary for approximately 2,550 linear feet of 6-inch water main in place; fire hydrants; valves, water service pipe and curb stops; surface restoration, PCC pavement, PCC driveway, PCC sidewalk and miscellaneous associated work, including cleanup. ADD ALTERNATE 1 Construct the 2022 Water Main Replacement including all labor, materials and equipment necessary for approximately 1,015 linear feet of 6-inch water main in place; fire hydrants; valves, water service pipe and curb stops; surface restoration, PCC pavement, PCC driveway, PCC sidewalk and miscellaneous associated work, including cleanup. All proposals in connection therewith shall be submitted to the Clerk of said Perry Water Works on or before the time herein set for said hearing. All proposals shall be made on official bidding blanks furnished by the Perry Water Works, and any alterations in the official form of proposal will entitle the Board, at its option, to reject the proposal involved from consideration. Each proposal shall be sealed and plainly identified. Each proposal shall be made out on a blank form furnished by the Perry Water Works and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of five percent (5%) of the bid. The bid security should be made payable to the Perry Water Works. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the Board as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the Board insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and other contract documents. Bidders shall use the bid bond form bound in the specifications. The award of the contract will be made to the lowest responsible bidder submitting the lowest responsive bid, which shall be determined without regard to state or local law whereby preference is given on factors other than the amount of the bid. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. The Board of Trustees reserves the right to reject any or all bids and to waive informalities or technicalities in any bid and to accept the bid which it deems to be in the best interest of the Perry Water Works. The Board reserves the right to defer acceptance of any proposal for a period not to exceed thirty (30) calendar days from the deadline for submission of proposals. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the Board and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the Perry Water Works from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of two (2) years after its completion and acceptance by the Board of Trustees. The work will commence within ten (10) calendar days after written Notice to Proceed. All work on the project shall be completed by May 31, 2023. Liquidated damages in the amount of Three Hundred Dollars($300.00) per consecutive calendar day will be assessed for each day that the work remains uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Payment for said improvements will be made in cash from sale of general obligation bonds or notes, water revenue bonds or notes, or from such funds as are legally available for said purposes. Any combination of the above methods of payment may be used at the discretion of the Board of Trustees. Payment to the Contractor will be on the basis of monthly estimates equivalent to ninety-five percent (95%) of the contract value of the work completed and materials delivered to the site during the preceding calendar month. Estimates will be prepared on the first day of each month by the Contractor, subject to the approval of the Engineer, who will certify to the Board for payment each approved estimate on or before the tenth (10th) day of the following month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Upon completion of the work and its acceptance by the Board, the Contractor will be paid an amount which, together with previous payments, will equal ninety-five percent (95%) of the contract price of the contract. Final payment of the remaining five percent (5%) will be made not less than thirty-one (31) days after completion and acceptance by resolution of the Board of Trustees of the completed contract, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa. No such partial or final payments will be due until the Contractor has certified to the Clerk that the materials, labor and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents