Similar Projects
Heerf III Hvac Updates for Covid Prevention Engineering Intervention Touchless Doors Nahc Campus Hinds Community College
Renovation
Design
$800,000 CJ est. value
Raymond, MS 39154

Scott Hall - 2022 HVAC Renovations
Alteration
Bidding
Decatur, MS

Humphrey High School HVAC Improvements
Renovation, Infrastructure
Sub-Bidding
$1,255,000 CJ est. value
Belzoni, MS 39038

Phase II Upgrade HVAC Controls Natural Products and Faser Hall
Renovation
Sub-Bidding
$400,000 CJ est. value
University, MS 38677

Saint Martin Middle School (SMMS) HVAC Upgrade
Renovation
Post-Bid
$200,000 CJ est. value
Ocean Springs, MS 39564

Replace Two 10-ton Hvac Split Systems in Pascagoula
Renovation
Post-Bid
$100,000 CJ est. value
Pascagoula, MS 39567

2021 HEERF III HVAC Updates - Utica HVAC Improvements Phase 2
Alteration
Results
Utica, MS 39175

2021 HEERF III HVAC Updates for COVID Prevention (Touchless Doors) - Rankin Campus
Alteration
Results
$700,000 est. value
Pearl, MS 39208

ARPA Mitigation - Walnut Grove Correctional Facility
Renovation
Sub-Bidding
$1,700,000 CJ est. value
Walnut Grove, MS 39189

George County High School and George County Middle School HVAC Improvements
Alteration
Post-Bid
$450,000 to $5,500,000 est. value
Lucedale, MS 39452

Canton Public School District Indoor Air Quality Improvements
Alteration
Results
$500,000 est. value
Canton, MS 39046

Humphrey High School Hvac Improvements
Renovation
Sub-Bidding
$1,573,000 CJ est. value
Belzoni, MS 39038

HVAC Replacement Overstreet Elementary School
Renovation
Post-Bid
$500,000 CJ est. value
Starkville, MS 39759

2021 HEERF III HVAC Updates for COVID Prevention (Part Two) Utica HVAC Improvements Phase 3
Alteration
Results
$500,000 est. value
Utica, MS 39175

HVAC Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Gulfport, MS 39501

Last Updated 10/18/2023 05:07 AM
Project Title

Gulfport School District HVAC Replacement

Physical Address View project details and contacts
City, State (County) Gulfport, MS 39501   (Harrison County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Your firm is invited to submit an offer under seal to Owner for construction of a The project consist of replacement of rooftop package units, split systems, and water source heat pumps across various schools within the district. Replacement includes all associated electrical, roof curbs, accessories, and controls to preform work and associated scope of work located at: Gulfport High School: 100 Perry St. Gulfport MS 39507 Anniston Elementary School: 2314 Jones St. Gulfport MS 39507 Bayou View Elementary School: 4849 Washington Ave Gulfport MS 39507 Bayou View Middle School: 212 43rd St. Gulfport MS 39507 Pass Road Elementary School: 37 Pass Road Gulfport MS 39507 Central Elementary School: 1043 Pass Rd/ Gulfport MS 39501 Central Middle/ West Elementary School: 4051 15th St. Gulfport MS 39501 Project Description: This project consists of The project consist of replacement of rooftop package units, split systems, and water source heat pumps across various schools within the district. Replacement includes all associated electrical, roof curbs, accessories, and controls to preform work as described in the Construction Documents and Specifications. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount or a certified check for a sum no less than 5 percent of the Bid Amount. Refer to other bidding requirements described in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information. Online bids can be placed on the website of the Architect at www.mpengplans.us If Bids are electronically submitted, then a title page containing the same information as would occur on the front of a sealed envelope must be included and must be clearly indicated as such in the file name. Bids in excess of $50,000.00 must be marked on the outside of the envelope with the contractor's Mississippi certificate of responsibility number as issued by the Mississippi Board of Contractors along with a copy of the General Contractor's proof of Mississippi license. Your offer will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. This is a federally funded project and shall comply with all State and Federal requirements, including but not limited to compliance with any applicable Davis-Bacon Act requirements and other laws and regulations as referenced in the Construction Documents and Specifications. The Owner reserves the right to accept or reject any or all offers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents