Similar Projects
URMC Medical Building
New Construction - 29,000 SF
Conception
$5,000,000 to $7,000,000 est. value
Webster, NY 14580

Outpatient Physical Therapy Clinic
Build-Out
Conception
$2,431,912 est. value
Canton, NY 13617

Medical Office Building
New Construction - 10,000 SF
Design
$1,500,000 to $2,000,000 est. value
White Plains, NY 10601

City Harbor Waterfront Development
New Construction - 316,280 SF
Design
$6,775,092 est. value
Ithaca, NY 14853

New Primary Care & PT Outpatient Center
Renovation - 6,808 SF
Bidding by Invitation
New Windsor, NY 12553

Health Professionals Hub
New Construction - 50,000 SF
Post-Bid
$20,000,000 est. value
Buffalo, NY 14201

WellNow Urgent Care
New Construction, Demolition - 3,500 SF
Post-Bid
$772,000 est. value
Buffalo, NY 14207

Pharmacy Renovation Phases 2, 3 and 4
Renovation
Results
$2,500,000 to $4,000,000 est. value
Valhalla, NY

OCDOH Office Interior Renovations
Renovation
Results
Middletown, NY 10940

Medical Village Emergency, Radiology & Bariatric Unit Renovations
Renovation
Construction
$40,000,000 est. value
Port Jervis, NY 12771

Multi-Family Housing & Jericho Road Neighborhood Clinic
Renovation - 8,200 SF
Construction
$10,000,000 est. value
Buffalo, NY 14211

Medical Offices
Addition - 1,540 SF
Pending Verification
Poughkeepsie, NY 12601

Veterans Affairs Niagara Falls Outpatient Clinic
Build-Out - 7,523 SF
Pending Verification
$900,000 est. value
Niagara Falls, NY 14301

CMH Medical Plaza West
New Construction
Conception
Catskill, NY 12414

Gateway Lofts
New Construction, Renovation - 100,000 SF
Design
$34,000,000 est. value
Jamestown, NY 14701

Last Updated 07/15/2020 08:08 AM
Project Title

Mary Walker Health Center Renovations Phase II at SUNY Oswego

Physical Address View project details and contacts
City, State (County) Oswego, NY 13126   (Oswego County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes work on the basement, first floor and roof. Abatement of steel beam fireproofing (basement); duct removal, ceiling removal/replacement, and floor penetrations. Basement wall penetrations and removals for pathways. Removing existing baseboard heating system. New work includes: Chases and replacement partitions associated with vertical pathways. Electrical upgrades thourghout. Incorporate designed A/c and vent systems(1st floor only). Locate condenser units. Complete NFPA 13 sprinkler system including cloud ceilings. South and east storefront entrances: include new aluminum storefront doors and enclosures. Include entrance floor mat in South ventibule.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents