Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Post-Bid
Less than $1,158,847 est. value
Jacksonville, FL 32099

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Salt Lake (Entry Improvements)
Post-Bid
Less than $75,000 est. value
Mims, FL 32754

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

Concrete Horizontal Cutting on Public Walking Surfaces - ADA Compliance
Results
Less than $100,000 est. value
Tampa, FL 33601

Osceola Technical College (TECO) Parking Lot Expansion
Post-Bid
Kissimmee, FL 34744

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Sidewalk Replacement at Public Housing Property
Post-Bid
Eustis, FL 32726

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Last Updated 08/27/2020 04:28 AM
Project Title

Sidewalk/Drainage Improvements/Turnout Construction and Base Work (BDI)

Physical Address View project details and contacts
City, State (County) FL   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $961,137
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

contract consist of lead project FPID 438111-1-52-01 construction of six-foot sidewalk on SR 30 (US 98B) from CR 22A Bob Little Road to SR 30A (US 98) Tyndall Parkway. Improvements also include goes with FPID 440386-1-52- 01 consist of the construction of six-foot sidewalk on SR 30 (US 98B) East Highway 98 from Park Entrance to CR 22A Bob Little Road. Improvements also include goes with FPID 440386-2-52-01 consist of the construction of six-foot sidewalk on West Street from SR 30 (US 98B) East Highway 98 to Cedar Street. Improvements also include goes with FPID 440386-3-52-01 consist of the construction of six-foot sidewalk on CR 22A Bob Little Road from SR 30 (US 98B) East Highway 98 to Lake Drive in Bay County. Incidental work includes minor drainage improvements and signing and pavement markings. Section 0001 Roadway 0101- 1- Mobilization (43811115201) Ls 1.000 0101- 1- Mobilization (44038615201) Ls 1.000 0101- 1- Mobilization (44038625201) Ls 1.000 0101- 1- Mobilization (44038635201) Ls 1.000 0102- 1- Maintenance Of Traffic (43811115201) Ls 1.000 0102- 1- Maintenance Of Traffic (44038615201) Ls 1.000 0102- 1- Maintenance Of Traffic (44038625201) Ls 1.000 0102- 1- Maintenance Of Traffic (44038635201) Ls 1.000 0102- 4- Pedestrian Special Detour (43811115201) Ls 1.000 0102- 60- Work Zone Sign Ed 11,520.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 50,940.000 0102- 74- 8 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Fd 2,160.000 0102- 74- 8 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Fd 5,400.000 0102- 74- 8 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Fd 3,860.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 1,496.000 0102-909- Temporary Raised Rumble Strips- Per Day, Includes All Sets And Relocations Da 180.000 0104- 10- 3 Sediment Barrier Lf 3,500.000 0104- 18- Inlet Protection System Ea 9.000 0107- 1- Litter Removal Ac 30.530 0107- 2- Mowing Ac 17.310 0110- 1- 1 Clearing & Grubbing (43811115201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (44038615201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (44038625201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (44038635201) Ls 1.000 0110- 4- 10 Removal Of Existing Concrete Sy 1,133.000 0110- 7- 1 Mailbox, f&i Single Ea 14.000 0120- 1- Regular Excavation Cy 611.500 0120- 2- 2 Borrow Excavation, Truck Measure Cy 697.800 0120- 6- Embankment Cy 6.600 0160- 4- Type b Stabilization Sy 1,259.000 0285-704- Optional Base, Base Group 04 Sy 10.000 0285-706- Optional Base, Base Group 06 Sy 107.000 0286- 1- Turnout Construction/Driveway Base- Optional Materials Sy 1,390.000 0334- 1- 12 Superpave Asphaltic Conc, Traffic b Tn 104.100 0334- 1- 53 Superpave Asphaltic Concrete, Traffic c, Pg76-22 Tn 25.400 0337- 7- 80 Asphalt Concrete Friction Course,Traffic b, Fc-9.5, Pg 76-22 Tn 5.900 0339- 1- Miscellaneous Asphalt Pavement Tn 5.000 0400- 2- 12 Concrete, Class Ii, Trench Slab Cy 0.400 0425- 1-521 Inlets, Dt Bot, Type c,<10` Ea 5.000 0425- 1-575 Inlets, Ditch Bottom, Type g, Partial Ea 1.000 0425- 1-910 Inlets, Closed Flume Ea 3.000 0425- 2- 71 Manholes, j-7, <10` Ea 1.000 0425- 4- Inlets, Adjust Ea 3.000 0430-174-118 Pipe Culvert, Optional Material, Round, 18"Sd Lf 8.000 0430-175-118 Pipe Culvert,Optional Material,Round, 18"s/Cd Lf 249.000 0430-175-136 Pipe Culvert, Opt Material, Round, 36"s/Cd Lf 16.000 0430-200- 25 Flared End Section, Concrete, 18" Ea 1.000 0430-518-100 Straight Concrete Endwalls, 18", Single, 0 Degrees, Round Ea 1.000 0430-610-125 u-Endwall, Index261/430-011, 1:4 Slope, 18"Pipe Ea 1.000 0430-963- 1 Pvc Pipe For Back Of Sidewalk, 4" Lf 56.000 0515- 1- 1 Pipe Handrail - Guiderail, Steel Lf 11.000 0515- 1- 2 Pipe Handrail - Guiderail, Aluminum Lf 63.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 1,456.000 0520- 2- 4 Concrete Curb, Type d Lf 22.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 1,949.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 2,439.000 0524- 1- 1 Concrete Ditch Pavt, Non Reinforced, 3" Sy 13.000 0527- 2- Detectable Warnings Sf 441.000 0570- 1- 2 Performance Turf, Sod Sy 6,493.000 0999- 25- Initial Contingency Amount, Do Not Bid (43811115201) Ls 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (44038615201) Ls 1.000 Section 0002 Signing 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 4.000 0700- 1- 50 Single Post Sign, Relocate As 11.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 0.004 0710- 11-102 Painted Pavement Markings, Standard, White, Solid For Interchange And Urban Island, 8" Gm 0.009 0710- 11-123 Painted Pavement Markings, Standard, White, Solid For Crosswalk And Roundabout, 12" Lf 143.000 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 0.007 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" For Crosswalk And Roundabout Lf 830.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 109.000 0711- 14-123 Thermoplastic, Preformed, White, Solid, 12" For Crosswalk Lf 169.000 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 306.000 0711- 17- 1 Thermoplastic, Remove Existing Thermoplastic Pavement Markings- Surface To Remain Sf 144.000

Details

Division 22 - Plumbing, Facility Storm Drainage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents