Similar Projects
Lake - Replace Meters & Backflow Preventers
Infrastructure
Bidding

Lake - Replace Meters & Backflow Preventers
Infrastructure
Bidding

Brunswick Transmission Main Repair
Post-Bid
Carson City, NV

Backflow Testing City Wide
Term Contract
Post-Bid
North Las Vegas, NV

Hollywood System Centennial To Speedway #2 Detention Basin
Results
$9,000,000 to $9,500,000 est. value
North Las Vegas, NV 89031

Kings Row Fire Flow Upgrades
Results
$153,900 to $188,100 est. value
Reno, NV

Street Construction and Utility Extensions
Term Contract, Infrastructure
Post-Bid
Winnemucca, NV

Water Main Replacement Project for G Street and Shriver Boulevard
Results
$338,962 to $414,286 est. value
Reno, NV

Airport Waterline Replacement Labor Commission Project
Infrastructure
Post-Bid
Mesquite, NV

Maryland Campus Vault Repairs
Results
$150,000 est. value
Las Vegas, NV

Newport Lane Water Main Replacement
Results
$278,757 to $340,703 est. value
Reno, NV

Sparks Marina Lake Level Control Pipeline Project
Infrastructure
Results
$815,270 est. value
Sparks, NV

Caughlin 5 Pressure Zone Looping
Infrastructure
Results
$608,850 to $744,150 est. value
Reno, NV

South Virginia 24" Main (Kumle To Peckham)
Alteration
Results
$1,024,650 to $1,252,350 est. value
Reno, NV

Backflow Preventer Replacements at North Las Vegas Airport
Infrastructure
Results
North Las Vegas, NV 89032

Reported 08/19/2021 11:02 AM
Project Title

Valve and Actuator Conversion

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89121   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase two (2) 16” Resilient Seated Ball Valves and Valve Actuators, FOB Destination, Freight Prepaid, in accordance with the bid specifications, drawings, and conditions. This bid is for the units only; no installation. The units offered shall be new, unused, and the current production model.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents