Similar Projects
West Marlborough Street Storm Drain Improvements
Results
Newport, RI 02840

Storm Drain Cleaning, Rooting and Repair
Results
Kingston, RI

Esmond Park Stormwater Quality Improvements
Results
Smithfield, RI 02917

Storm-Water Drainage Inspection
Infrastructure
Results
Westerly, RI

Park Street Flood Management and Green Infrastructure Project
Results
Warren, RI 02885

Aquidneck Island Waters Project- Phase I Carriage and Island Drive Stormwater BMPs
Results
Less than $232,000 est. value
Middletown, Portsmouth, RI

Last Updated 08/06/2021 10:28 AM
Project Title

Warwick Ponds Buckeye Brook Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Warwick, RI   (Kent County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the first retrofit (SCP-WP-014) generally includes, but is not limited to: removing the existing wet pond and associated drainage structures and pipes; constructing the proposed expanded wet pond; installing new drain structures, pipes, pretreatment unit, cement concrete overflow weir with riprap, and plantings; placing riprap pad at pipe outfall; removing and replacing chain link fence and guardrail; installing the grassed access path; cleaning existing drainage structures and pipes; preparing the site and installing temporary erosion controls; providing maintenance and protection of traffic and all other incidentals necessary to complete the work. The work for the second retrofit (SCP-WP-015) generally includes, but is not limited to: removing the existing wet pond and associated drainage structures and pipes; constructing the proposed bioretention basin; installing new drain structures, pipes, pretreatment unit, and overflow structure; placing riprap pad at pipe outfall; removing and replacing chain link fence; installing the grassed access path; cleaning existing drainage structures and pipes; preparing the site and installing temporary erosion controls; providing maintenance and protection of traffic and all other incidentals necessary to complete the work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents