Similar Projects
2022 Long - Term Flow Monitoring Services
Infrastructure
Bidding
San Antonio, TX

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Knob Creek Basin Wastewater Projects
Infrastructure
Pending Verification
$28,930,000 est. value
Temple, TX

Coast Guard Station Freeport Waterline Repairs
Post-Bid
$10,000 to $25,000 est. value
Surfside Beach, TX 77541

Country Side Water Main Replacement & Hydrant Additions
Results
$283,076 est. value
Fairview, TX 75069

Replace Water Storage Tank with Feed Water System
Post-Bid
Brownwood, TX

Water Resources Integration Program (Wrip) Phase 2 - Pipeline Segments 2C And 3 Project
Results
Less than $57,943,000 est. value
San Antonio, TX 78212

Water Service Connections
Infrastructure
Post-Bid
Houston, TX

Street Reconstruction - Linwood Oaks and Orange Circle and Orange Circle Waterline
Results
Less than $1,493,273 est. value
Pearland, TX 77581

592-Feet Of 12-Inch Water Main Near Toutant Beauregard and Future Zinnia Crest Blvd
Infrastructure
Post-Bid
San Antonio, TX 78249

Central Small Diameter Package 4B Project
Results
Less than $2,462,853 est. value
San Antonio, TX 78212

Construction of the Avenue South Water Improvements
Infrastructure
Post-Bid
Belton, TX 76513

Reported 03/02/2022 12:00 AM
Project Title

Industrial Park Water System Improvements Phase 2 - Ground Storage Tank, Pump Station and Distribution Improvements

Physical Address View project details and contacts
City, State (County) Hillsboro, TX   (Hill County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,670,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the construction of a 1000 gpm Pump Station, 100,000 Gallon Welded Steel Storage Tank, and Approximately 5000 Linear Feet of Distribution Water Main.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents