Project Title | Potable Water System Improvements |
Physical Address | View project details and contacts |
City, State (County) | New Cumberland, WV (Hancock County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 LS Mobilization/Demobilization, 1 LS Erosion and Sediment Control, 40 LF 12” Steel Casing (Bore and Jack), 20 LF of 12” Steel Casing (Open Cut), 15 LF 8” Steel Casing (Open Cut), 1,250 LF 10” Fusible Water Line 200 PSI, 420 LF 6” HDPE IPS DR9 (Horizontal Directional Drill), 400 LF 6” Fusible Water Line 250 PSI, 300 LF 10” Water Line 235 PSI, 2,100 LF 6” Water Line 235 PSI, 2,300 LF 4” Water Line 235 PSI, 120 LF 2” Water Line 235 PSI, 1,200 LF ¾” Service Tubing (Open Cut), 400 LF ¾” Service Tubing (Bore & Jack), 1 EA Tie New 10” Water Line into Existing 10” Water Line, 1 EA Tie New 10” Water Line into Existing 6” Water Line, 5 EA Tie New 8” Water Line into Existing 8” Water Line, 2 EA Tie New 6” Water Line into Existing 6” Water Line, 1 EA Tie New 6” Water Line into Existing 4” Water Line, 1 EA Tie New 4” Water Line into Existing 4” Water Line, 6 EA Tie New 2” Water Line into Existing 2” Water Line, 1 EA Tie Existing Service Line into New 6” Water Line, 1 EA 8” Gate Valve, 6 EA 6” Gate Valve, 1 EA 4” Gate Valve, 5 EA 2” Branch Connection, 1 EA Cut and Cap Existing 10” Water Line, 1 EA Cut and Cap Existing 8" Water Line, 2 EA Cut and Cap Existing 6" Water Line, 2 EA Cut and Cap Existing 4" Water Line, 7 EA Cut and Cap Existing 2" Water Line, 6 EA Fire Hydrant Assembly, Complete, 1 EA 2" Post Flushing Hydrant Assembly, 600 LF WVDOH Type "B" Trench Repair, 800 LF WVDOH Type "C" Trench Repair, 100 LF Concrete Sidewalk/Driveway Repair, 800 SF Full Width Crushed Stone Repair, 7 EA HDPE Concrete Anchor, 20 EA Test Pit, 3 EA Demolish Existing Gate Valve, 1,000 LB Ductile Iron Fittings Not Shown on Plans, 1 LS AMR Cellular Package, Complete, 40 EA New Cell Read Water Meter and Lid, 240 EA Type A Meter Replacement (Water Meter Cover), 200 EA Type B Meter Replacement (Water Meter Cover, Well), 40 EA Type C Meter Replacement (LPMS), 135 EA Type D Meter Replacement (Existing Inside Meter), 3 EA 1” Type A Meter Replacement (Water Meter Cover), 1 EA 1” Type B Meter Replacement (Water Meter, Cover, Well), 1 LS Chlorine Injection Facility Improvements, 1 LS New Electric On-Demand Water Heater, 1 LS Existing Chemical Injection Vault Improvements (Including New Mag Meter, Check Valve, Injection Quills, Piping and Drain), 1 LS Chlorine Injection Equipment Replacement (Including Dosing Pumps, Controls and Appurtenances), 3 EA 2” Gate Valve Replacement/Installation, 2 EA 4” Gate Valve Replacement/Installation, 16 EA 6” Gate Valve Replacement/Installation . |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |