Last Updated 11/13/2019 06:24 AM
Project Title

Rehabilitation/Reconstruction - Dillon and Marion Co

Physical Address View project details and contacts
City, State (County) (Dillon, Marion Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Csx Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 470.000 Sy Removal & Disposal Of Existing Curb 300.000 Lf Removal & Disposal Of Existing Concrete 17.780 Cy Borrow Excavation 2,968.000 Cy Excavation For Shoulder Paving 86.064 Sta Hauling Of Excavated Shoulder Material 86.064 Sta Cement Modified Recycled Base (12" Unif)-Curing Method b 169,986.000 Sy Portland Cement For Cement Modified Recycled Base Course 5,498.000 Ton Maintenance Stone 62.000 Ton Hma Shoulder Widening Course 430.320 Ton Liquid Asphalt Binder Pg64-22 1,921.477 Ton Full Depth Asph. Pav. Patching 8" Unif 800.000 Sy Full Depth Asph. Pav. Patching 10"Unif 5,400.000 Sy Milling Existing Asphalt Pavement 2.0" 53,830.000 Sy Milling Existing Asphalt Pavement 4.0" 8,202.000 Sy Milling Existing Asphalt Pavement (Variable) 2,000.000 Sy Milled-In Rumble Strip 28.220 Mi Hot Mix Asphalt Intermediate Course Type b 10,325.067 Ton Hot Mix Asphalt Surface Course Type b 11,161.607 Ton Hot Mix Asphalt Surface Course Type c 11,893.570 Ton Hot Mix Asphalt Surface Course Type d 410.000 Ton Driveway Paving-Surface Type d 672.500 Ton Permanent Construction Signs (Ground Mounted) 3,392.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 28,320.000 Lf 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 5,540.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 385,955.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 510.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 1,350.000 Lf Railroad Crossing Symbols - Fast Dry Paint 12.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 34,635.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 207,410.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 9,440.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 1,850.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 128,655.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 170.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 450.000 Lf Railroad Crossing Symbols - Thermoplastic - 125 Mil. 4.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 11,545.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 69,140.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 473.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 145.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,059.000 Ea Removal Of Pavement Markings 1,410.000 Lf Concrete Curb And Gutter(2`-0") Vertical Face 300.000 Lf Concrete Sidewalk(4" Uniform) 40.000 Sy Detectable Warning Material 175.000 Sf Concrete Driveway(6" Uniform) 80.000 Sy Pedestrian Ramp Construction 350.000 Sy Permanent Grassing For Non-Permitted Resurfacing Projects 10.010 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents