Similar Projects
Enclave At Brandywine
New Construction
Conception
Brandywine, MD

South Lake Development - Master Plan
New Construction - 5,272 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bowie, MD 20715

New Carrollton Metro
New Construction - 275,000 SF
Design
$500,000,000 est. value
New Carrollton, MD 20785

East Pines
New Construction - 25,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Riverdale, MD 20737

Wawa #8546 / Laurel
New Construction, Infrastructure - 5,585 SF
Bidding
$1,500,000 CJ est. value
Laurel, MD 20707

New Home Construction: 6224 Foote Street
New Construction, Infrastructure - 2,153 SF
Bidding
$450,000 CJ est. value
Capitol Heights, MD 20743

Electronic (LED) Displays Installation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Bowie, MD 20715

The Boulevard at 9091 Apartments
New Construction - 3,995 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
College Park, MD

Hampton Park Apartments
New Construction, Demolition - 238,183 SF
Post-Bid
Capitol Heights, MD 20743

Purple Line Beacon Heights Station Development
New Construction
Results
Riverdale, MD 20737

The Riverfront Multi-Family Development
New Construction - 10,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Hyattsville, MD 20782

Riverdale Park Station Phase 2 - Building 5
New Construction, Build-Out - 264,387 SF
Construction
$10,000,000 CJ est. value
Riverdale, MD 20737

Riverdale Mixed-Use
New Construction
Pending Verification
Riverdale, MD

Landy Property - Phase 2 Townhouses
New Construction
Pending Verification
Hyattsville, MD 20782

Mill Branch Crossing
New Construction - 77,635 SF
Conception
$226,000,000 est. value
Bowie, MD 20716

Last Updated 08/09/2022 09:03 AM
Project Title

Autumn Woods

Physical Address View project details and contacts
City, State (County) Bladensburg, MD 20710   (Prince Georges County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of 26 Buildings containing garden-style units and community building. Work includes site work, masonry restoration, metals, roofing, doors/windows, finishes, cabinets, accessories, plumbing, HVAC, & electrical. Of the 481 units there are (25) 504/ANSI type units requiring full renovation. Project Requirements: Davis Bacon Wage Scale Section 3 - 25% hours by Section 3 workers, 5% hours by targeted Section 3 workers MBE Participation *The owner requests that all subcontractor / supplier inquiries be directed to the Negotiated General Contractor.

Details

3 Stories Above Grade, 364,800 SF Apartments, 481 Unit(s).
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents