Similar Projects
North Campus Water Main Loop
Infrastructure
Post-Bid
Daytona Beach, FL

Alabama Avenue Reclaimed Water Wain Extension
Infrastructure
Post-Bid
$1,075,000 est. value
Deland, FL 32720

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Construction Management/General Contracting Services for Deleon Springs Utility Extensions
Results
Less than $4,000,000 est. value
De Land, FL 32720

N. US 1 Water Main/Force Main Extension
Results
Less than $3,430,050 est. value
Ormond Beach, FL 32175

Sugar Mill Drive 20-Inch Reclaimed Main Relocation
Results
New Smyrna Beach, FL 32168

Construction Management at Risk for Underground Utility Services
Results
Ormond Beach, FL 32175

FY 2020 Water Main Improvements
Results
Less than $1,500,000 est. value
De Land, FL

Furnish and Deliver PVC and HDPE Pipe for 2020 Water Main Improvements and State Road 44 Utilities Relocation
Results
De Land, FL 32720

Group 1 Water Main Replacements
Results
Less than $2,773,256 est. value
Deltona, FL

Birmingham Avenue and Kansas St. Watermain Replacement
Results
Less than $185,000 est. value
Holly Hill, FL

Ridgewood Avenue and Farmbrook Road Watermain Improvements
Results
Less than $600,000 est. value
Port Orange, FL

Construction Manager at Risk Pipe Rehabilitation and Looping Disinfection By-Product Reduction Project
Results
Less than $6,000,000 est. value
Orange City, FL

Howes Street and Orange Avenue Watermain and Drainage Improvements
Results
Less than $1,300,000 est. value
Port Orange, FL 32127

Reclaimed Water Main Extensions - Phase 4 and Adelle Avenue Loop
Results
Less than $6,000,000 est. value
DeLand, FL 32720

Reported 11/06/2021 12:00 AM
Project Title

Potable Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Orange City, FL   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Abandon and replace the water main service throughout the downtown area of Orange City, FL and run a new water main. This project includes directional drilling, open cuts, concrete replacement, asphalt repair, fire hydrant removal and replacement, taps, water treatment, MOT as well as several utility tie-ins.

Details

Division 01 - General Requirements, Project Utility Sources, Utility Service Connections, Vehicular Access and Parking, Traffic Control.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents