Similar Projects
New Gymnasium and Fieldhouse at Elberta High School
New Construction, Renovation - 26,970 SF
Bidding
Elberta, AL 36530

Drainage Rehabilitation (Materials Only)
Post-Bid
Robertsdale, AL

Point Aux Pins Living Shoreline Restoration at Alabama Department of Conservation and Natural Resources
Results
Foley, AL

New Women's Field House with Concessions and Public Restrooms at Spanish Fort High School
Results
Spanish Fort, AL 36577

Fairhope K-6 School Addition
Addition
Construction
Robertsdale, AL

Additions to Fairhope Middle School - Fairhope 9th Grade Academy
Addition - 44,500 SF
Results
Less than $6,696,000 est. value
Fairhope, AL 36532

Provision of Erosion Control Materials
Term Contract
Results
AL

Recreation Center Drainage and Tennis Center Court Improvements
Results
Less than $1,460,905 est. value
Orange Beach, AL 36561

Drainage Improvements on Fernwood Drive West
Results
Bay Minette, AL 36507

Renovations and Additions to Gulf Shores High School Gymnasium and Locker Room
Renovation, Addition - 18,187 SF
Results
$4,200,000 to $4,600,000 est. value
Gulf Shores, AL 36542

9th Grade Academy Addition to Daphne High School
Addition
Results
Daphne, AL 36526

Cupola Replacement at Fairhope High School
Results
Less than $25,000 est. value
Fairhope, AL 36532

Drainage Improvements for Oak Street and Section Street at Bid Mouth Gully
Results
Less than $233,415 est. value
Fairhope, AL 36532

Orange Beach High School Field House
Addition - 3,777 SF
Results
Orange Beach, AL 36561

Provision of Corrugated Round and Arch Bituminous Coated (Metal) Pipe
Results
AL

Reported 08/10/2021 03:58 PM
Project Title

Spanish Fort High School Baseball Drainage and Other Improvements

Physical Address View project details and contacts
City, State (County) Bay Minette, AL   (Baldwin County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $94,755
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all subsurface field drainage and related materials, supervision, labor, equipment, appliances, and services necessary for and incidental to completing a subsurface drainage system in strict accordance with these specifications and applicable drawings. In general, the Work is a subsurface drainage system for a baseball athletic field. 1. The general extent of the athletic field drainage work is for the playing surface inside field fencing with connection to existing storm drainage system, which is approximately 30 to 40 feet away from the outfield fencing. Also, the field should be fraise, cut & top dressed per specifications.

Details

1 Middle/Senior High School, Addition, Earthwork.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents