Similar Projects
Seal Beach Pump Station Replacement - 3-67 - Orange County Sanitation District
Renovation
Bidding
$78,923,000 CJ est. value
Seal Beach, CA 90740

Urgent Plumbing Services
Term Contract
Post-Bid
Santa Ana, CA 92701

Plumbing Maintenance Services
Term Contract
Post-Bid
Tustin, CA

Water Bottle Filling Station Replacements
Alteration
Results
$215,000 est. value
Santa Ana, CA

FY22-23 Manhole and Valve Box Adjustment
Infrastructure
Results
$591,250 CJ est. value
Yorba Linda, CA 92886

RFQ Contractor - Job Order Contract (JOC) for Plumbing Services
Term Contract
Post-Bid
Santa Ana, CA 92701

Digester #2 Structural and Mechanical Rehabilitation
Renovation
Results
$922,325 CJ est. value
San Clemente, CA 92672

Newport Beach Pump Stations Pressurization Improvements
Renovation, Infrastructure
Post-Bid
$1,412,000 CJ est. value
Santa Ana, CA 92708

Liquid Oxygen Tank A Replacement at Plant No. 2
Renovation, Infrastructure
Results
$3,300,000 CJ est. value
Huntington Beach, CA 92646

Tracks at Brea Western Extension Community Outreach and Concept Design
Infrastructure
Post-Bid
$200,000 CJ est. value
Brea, CA 92821

FY 2021/22 Sewer Lining Project
Infrastructure
Results
$1,318,770 CJ est. value
Huntington Beach, CA 92648

Citywide Plumbing Services
Term Contract
Post-Bid
$75,000 CJ est. value
Laguna Beach, CA 92677

Balcom Alley Sewer Replacement
Infrastructure
Results
$381,400 CJ est. value
Fullerton, CA 92832

On-Call Plumbing Services
Term Contract
Post-Bid
Newport Beach, CA 92663

Placement of Cured-In-Place Pipe (CIPP) and Manhole Rehabilitation
Infrastructure
Post-Bid
$300,000 CJ est. value
Brea, CA 92821

Last Updated 07/24/2023 02:16 PM
Project Title

JRWSS Crown Valley Parkway Transmission Main Relocation

Physical Address View project details and contacts
City, State (County) Laguna Beach, CA 92677   (Orange County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,884,665 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The JRWSS Crown Valley Parkway Transmission Main Relocation Project will include construction of approximately 2,500 LF of 36-inch CML&C steel water transmission main pipe in Crown Valley Parkway, pipe manway access vault, pipeline connections, air/vacuum relief valve, demolition and abandonment of existing water transmission main and vaults, pavement replacement, and construction of an impressed current cathodic protection system to include a 300-ft deep anode well, rectifier and supporting conduits, wiring and electrical service. Project Duration - 250 working days. Online Q&A - Online,Q&A Yes Q&A Deadline 01/23/2023 5:00 PM (PST). Bid Bond - Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents