Similar Projects
Last Updated | 07/07/2022 12:51 PM |
Project Title | Deer Valley Airport Precision Approach Path Indicator System Upgrade - Design-Bid- Build Services |
Physical Address | View project details and contacts |
City, State (County) | Phoenix, AZ (Maricopa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Runways/Taxiways |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of upgrading existing 2-box PAPIs at Deer Valley Airport (DVT) to 4-box LED PAPIs. Work shall include, but not be limited to, demolition of the existing PAPI systems, purchase, installation and flight check support of new 4-box LED PAPI systems on both ends of both runways at DVT for a total of four complete systems. Included will be the replacement of existing power cabling and transformers from the lighting vault to each site location, and any conduit and duct banks necessary to complete the installation and facilitate the proper operation of the new systems. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |