Watermain Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Hillside, IL 60162

Rebid - Replace Piping And Storm Sewer Pumps
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
Chicago, IL 60640

RFP RAS Pumps 4-6 Replacement
Infrastructure
Sub-Bidding
$325,000 CJ est. value
Mokena, IL 60448

Valve Operating, Leak Detection and Location Survey
Alteration
Post-Bid
Saint Charles, IL

Webster Center Restroom
Renovation - 700 SF
Post-Bid
Peoria, IL 61605

Mechanical And Plumbing Systems Renovation
Renovation
Results
Less than $4,000,000 est. value
Normal, IL 61790

Water Softeners
Alteration
Results
$150,000 to $250,000 est. value
Pekin, IL 61554

2020 Water Main Improvements
Infrastructure
Construction
$2,706,522 CJ est. value
Heyworth, IL 61745

Suppression Line - 3560 SW Adams
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Peoria, IL 61605

Casework, Toilet Room Renovation & Exterior Patio
Renovation, Alteration
Post-Bid
Carol Stream, IL 60188

Downers Grove North HS Roofing and Plumbing
Alteration
Results
Downers Grove, IL 60515

North Palos 2022 Capital Improvements - Bid Release #2
Renovation, Alteration
Post-Bid
Hickory Hills, Palos Hills, IL 60457

Building 18 Plumbing Repairs
Alteration
Results
Jacksonville, IL

Miscellaneous Water Pipe, Valves, Fittings, And Other Accessories
Term Contract, Alteration
Post-Bid
Morton, IL

Legacy Park Concession Stand Plumbing
Alteration
Results
Manteno, IL

Last Updated 07/25/2023 12:47 PM
Project Title

Contract A - Water System Improvements Contract B - 500,000 Gallon Water Storage Tank Painting

Physical Address View project details and contacts
City, State (County) Rushville, IL 62681   (Schuyler County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,262,752 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Contract A - Water System Improvements Contract B - Water Storage Tank Painting The work shall generally consist of: CONTRACT "A" - WATER SYSTEM IMPROVEMENTS Demolition of the Logan Street concrete ground storage tanks, new Logan Street ground storage tank, demolition and replacement of the Hilltop Water Treatment Plant raw water ground storage tank, valve & hydrant replacements and miscellaneous electrical, controls, piping and appurtenances CONTRACT "B" - 500,000 GALLON ELEVATED WATER STORAGE TANK PAINTING Full rehabilitation of the 500,000 gallon Washington Street elevated water storage tank along with restoration of miscellaneous structural tank components ANY CONTRACT OR CONTRACTS AWARDED UNDER THIS INVITATION FOR BIDS ARE EXPECTED TO BE FUNDED IN PART BY A LOAN FROM THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY (ILLINOIS EPA). NEITHER THE STATE OF ILLINOIS NOR ANY OF ITS DEPARTMENTS, AGENCIES, OR EMPLOYEES IS OR WILL BE A PARTY TO THIS INVITATION FOR BIDS OR ANY RESULTING CONTRACT. THE PROCUREMENT WILL BE SUBJECT TO REGULATIONS CONTAINED IN THE PROCEDURES FOR ISSUING LOANS FROM THE WATER POLLUTION CONTROL LOAN PROGRAM (35 IAC PART 365), THE DAVIS-BACON ACT (40 USC 276A THROUGH 276A-5) AS DEFINED BY THE UNITED STATES DEPARTMENT OF LABOR, THE EMPLOYMENT OF ILLINOIS WORKERS ON PUBLIC WORKS ACT (30 ILCS 570), ILLINOIS WORKS JOBS PROGRAM ACT (30 ILCS 559/20-1), AND THE FEDERAL "BUILD AMERICAN, BUY AMERICA ACT" REQUIREMENTS CONTAINED IN THE INFRASTRUCUTRE INVESTMENT AND JOBS ACT, PUB. L. NO. 117-58(except as otherwise noted). "USE OF AMERICAN IRON AND STEEL" REQUIREMENTS AS CONTAINED IN SECTION 436 OF H.R. 3547, THE CONSOLIDATED APPROPRIATIONS ACT, 2014. THIS PROCUREMENT IS ALSO SUBJECT TO THE LOAN RECIPIENT'S POLICY REGARDING THE INCREASED USE OF DISADVANTAGED BUSINESS ENTERPRISES. THE LOAN RECIPIENT'S POLICY REQUIRES ALL BIDDERS TO UNDERTAKE SPECIFIED AFFIRMATIVE EFFORTS AT LEAST SIXTEEN (16) DAYS PRIOR TO BID OPENING. THE POLICY IS CONTAINED IN THE SPECIFICATIONS. BIDDERS ARE ALSO REQUIRED TO COMPLY WITH THE PRESIDENT'S EXECUTIVE ORDER NO. 11246, AS AMENDED. THE REQUIREMENTS FOR BIDDERS AND CONTRACTORS UNDER THIS ORDER ARE EXPLAINED IN 41 CFR 60-4 In submitting Proposals for the planned work, the Bidder shall declare that only persons or parties interested in the proposed work as Principals are those contained in the Proposal; and that the Proposal is made without collusion with any other person, firm or corporation. All questions of a technical nature regarding the project will only be answered in writing by Addendum. Any questions may be submitted by telephone or in writing to Jamie Headen, Project Engineer, jheaden@bentonassociates.com, 217-245-4146,or at the Pre-Bid Meeting. Questions should be submitted to the Engineer no later than five (5) working days prior to the bid date. Bid Result : Contract "A" - Hood Construction Group - $ 493,202.00 Contract "B" - Neumann Co. Contractors - $ 774,550.00 Contract "C" - Leander Construction, - $ 2,995,000.00

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents