Similar Projects
Homestead High School - Phase 1 Site Development
Post-Bid
Fort Wayne, IN 46814

Homestead High School Phase 2A Early Release Packages
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

Disaster Recovery Services
Results

Posterity Heights Remediation
Results
Fort Wayne, IN 46802

Homestead High School Phase 2B
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

Site Improvements at Haley Elementary School
Results
Fort Wayne, IN 46815

FWCS: CMc Services for Renovation, and Accessibility and Security Improvements
Renovation
Post-Bid
Fort Wayne, IN 46819

2021 Site and Traffic PPI
Results
Fort Wayne, IN

On-Call Emergency Excavation Services
Term Contract
Post-Bid
Fort Wayne, IN

Annex and Administration Building
Renovation
Results
New Haven, IN 46774

Demolition and Lot Restoration for Neighborhood Code
Infrastructure
Post-Bid
Fort Wayne, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Homestead High School Phase 3A
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

Expansion and Renovation of Levan R. Scott Academy
Renovation, Addition
Results
$11,600,000 est. value
Fort Wayne, IN 46806

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

Reported 12/18/2021 12:00 AM
Project Title

FWCS Wayne HS - Bid Package 2 Building and Sitework

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46895   (Allen County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $46,000,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The renovation of Wayne High School would include upgrading all mechanical, plumbing, electrical systems, building finishes, exterior envelope, code compliance and ADA accessibility. The Wayne High School building is a two-story brick building originally constructed in 1971 with two additions completed in 1995 and 2011. The total building area is 318,613 SF. The total project estimate is $46 million.

Details

Middle/Senior High School, 2 Stories Above Grade, 318,613 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents